This 16-hour package is intended for Class 4 Water Operators in Virginia. The following courses are included:

  • Fluid Mechanics - 1 hour
  • Piping Systems Part 1 - 5 hours
  • Piping Systems Part 2 - 5 hours
  • Wastewater Treatment Processes - 5 hours

Course Format: Text

Credit Type: All Operators

Approved By: Department of Professional & Occupational Regulation

16-Hour Package for Class 4 Water Operators

  • Fluid Mechanics [11 Activities]
    • 01. Definition of a Fluid
    • 02. Fluids Distribute Forces
    • 03. Definition of Pressure
    • 04. Measuring Pressure
    • 05. Sources of Fluid Pressure
    • 06. Gauge Verses Absolute Pressure
    • 07. Liquid Seeks Its Own Level
    • 08. Velocity Head Verses Static Pressure
    • 09. The Bernoulli Effect and Venturi Applications
    • 10. Friction Head
    • 11. The Siphon
  • Piping Systems Part 1 [45 Activities]
    • 01. Piping Systems
    • 02. Fluids
    • 03. Protecting Steam Lines
    • 04. Keeping Fluids Clean and Moving
    • 05. Piping System Maintenance
    • 06. Valves and Fittings
    • 07. Pipe Hangers and Supports
    • 08. Temperature Effects
    • 09. Piping Insulation
    • 10. Typical Piping Systems
    • 11. Maintenance Considerations
    • 12. Pipes
    • 13. Pipe Schedules and Other Pipe Codes
    • 14. Types of Systems
    • 15. Metal Piping and Characteristics of Metals
    • 16. Pipe-Manufacturing Methods
    • 17. Behavior of Fluids in Piping
    • 18. Piping Applications
    • 19. Maintenance Considerations
    • 20. Joining Pipe
    • 21. Nonmetallic Piping Materials
    • 22. Concrete Pipe
    • 23. Asbestos-Cement Pipe
    • 24. Plastic Pipe
    • 25. Limitations of Plastic Pipe
    • 26. Joining Plastic Pipe
    • 27. Maintaining Plastic Pipe
    • 28. Glass Pipe
    • 29. Maintenance Requirements
    • 30. Tubing
    • 31. Advantages of Tubing
    • 32. Tube Joining
    • 33. Types of Tubing
    • 34. Tubing Applications
    • 35. Plastic Tubing
    • 36. Other Applications and Maintenance
    • 37. Hoses
    • 38. Codes and Sizes
    • 39. Hose Classifications
    • 40. Hose Terminology
    • 41. Reinforced Nonmetallic Hose
    • 42. Nonmetallic Hose
    • 43. Metallic Hose
    • 44. Hose Couplings
    • 45. Maintenance
  • Piping Systems Part 2 [49 Activities]
    • 01. Fittings
    • 02. Functions of Fittings
    • 03. Screwed and Flanged Connections
    • 04. Other Fittings
    • 05. Welded Connections
    • 06. Tube Fittings
    • 07. Drawing Symbols
    • 08. Valves
    • 09. Types of Industrial Valves
    • 10. Gate Valves
    • 11. Globe Valves
    • 12. Needle Valves
    • 13. Ball Valves
    • 14. Butterfly Valves
    • 15. Plug Valves
    • 16. Check Valves
    • 17. Quick-Opening Valves
    • 18. Valve Maintenance and Connections
    • 19. Specialized Valves and Diaphragm Valves
    • 20. Blowdown Valves
    • 21. Pressure-Regulating Valves
    • 22. Temperature-Regulating Valves
    • 23. Safety Valves
    • 24. Relief Valves
    • 25. Rupture-Disk Relief Valves
    • 26. Reducing Valves
    • 27. Other Valves
    • 28. Valve Operators
    • 29. Magnetic, Pneumatic, and Hydraulic Operators
    • 30. Remote Control
    • 31. General Applications
    • 32. Strainers
    • 33. Filters
    • 34. Steam
    • 35. Traps
    • 36. Vent Valves
    • 37. Trap Maintenance
    • 38. Typical Piping System
    • 39. Pressure Gauges
    • 40. Temperature Gauges
    • 41. Rotary Pressure Joints
    • 42. Vacuum Breakers
    • 43. Accumulators
    • 44. Receivers
    • 45. Actuators and Intensifiers
    • 46. Pneumatic Pressure Line Accessories
    • 47. Heat Exchangers
    • 48. Wrenches
    • 49. Maintenance
  • Wastewater Treatment Processes [46 Activities]
    • 01. Purpose of Treatment
    • 02. Sources of Wastewater
    • 03. Wastewater Collection Systems
    • 04. Typical Treatment Facilities
    • 05. Influent
    • 06. Preliminary Treatment
    • 07. Primary Treatment
    • 08. Secondary Treatment
    • 09. Tertiary Treatment
    • 10. Disinfection and Effluent Discharge
    • 11. Solids Handling
    • 12. Screening
    • 13. Grinding
    • 14. Grit Removal
    • 15. Sedimentation
    • 16. Factors Affecting Settling Rates
    • 17. Types of Clarifiers
    • 18. Air Flotation
    • 19. Filtration and Effluent Disposal
    • 20. Solids in Wastewater
    • 21. Chemical Coagulants
    • 22. Phosphorus Removal
    • 23. Chemical Clarification Equipment
    • 24. Disinfection
    • 25. Factors Affecting Disinfection
    • 26. Disinfection with Chlorine
    • 27. Equipment Used in Chlorine Feeding
    • 28. Lagoons
    • 29. Activated Sludge
    • 30. Aeration with Pure Oxygen
    • 31. Trickling Filters
    • 32. Distribution Systems
    • 33. Trickling Filter Operations
    • 34. Synthetic Media
    • 35. Activated Biofilter Processes (ABF)
    • 36. Rotating Biological Contactors (RBC)
    • 37. Secondary Clarifiers
    • 38. Three Processes
    • 39. Sludge Conditioning
    • 40. Thickening and Dewatering
    • 41. Drying Beds
    • 42. Lagoons
    • 43. Vacuum Filtration and Filter Presses
    • 44. Further Reduction of Water Content
    • 45. Composting
    • 46. Ultimate Disposal

Course Completion

  • Mandatory Questionnaire
  • Fluid Mechanics - Certificate of Achievement
  • Piping Systems Part 1 - Certificate of Achievement
  • Piping Systems Part 2 - Certificate of Achievement
  • Wastewater Treatment Processes- Certificate of Achievement