This 12-hour package is intended for Level 3 and 4 Water Operators in Tennessee. Approved courses include:
- Electrical Safety (NFPA 70E 2024) - 5 hours
- Pump Installation and Maintenance - 3.5 hours
- Valve Maintenance and Piping System Protection - 3.5 hours
Course Format: Text
Credit Type: All Operators
Course ID(s): R23310, R23307, R24214
Approved By: Department of Environment and Conservation - Fleming Training Center
12-Hour Package for Level 3 and 4 Water Operators
- Electrical Safety (NFPA 70E 2024)
- Electrical Safety (NFPA 70E 2024) Part 1 [25 Activities]
- 01. Article 90: Sections 90.1, 90.2, 90.3
- 02. Article 90: Sections 90.4, 90.5, 90.6
- 03. Article 100: Definitions
- 04. Article 105: Application of Safety-Related Work Practices and Procedures
- 05. Article 110: General Requirements for Electrical Safety-Related Work Practices
- 06. Section 110.3, Electrical Safety Program.
- 07. Section 110.4, Training Requirements.
- 08. Section 110.5, Host and Contract Employers Responsibilities.
- 09. Section 110.6, Test Instruments and Equipment.
- 10. Section 110.7(A)&(B), Portable Cord- and-Plug-Connected Electric Equipment.
- 11. Section 110.7(C)-(F), Portable Cord- and-Plug-Connected Electric Equipment.
- 12. Section 110.8, Ground-Fault Circuit-Interrupter (GFCI) Protection.
- 13. Section 110.8, Ground-Fault Circuit-Interrupter (GFCI) Protection. 110.9 Overcurrent Protection Modification. 110.10, Equipment Use.
- 14. Article 120: Establishing an Electrically Safe Work Condition
- 15. Section 120.2, Lockout/Tagout Program.
- 16. Section 120.3, Lockout/Tagout Principles.
- 17. Section 120.4, Lockout/Tagout Equipment.
- 18. Section 120.5, Lockout/Tagout Procedures PART-I.
- 19. Section 120.5, Lockout/Tagout Procedures PART-II.
- 20. Section 120.6, Process for Establishing and Verifying an Electrically Safe Work Condition.
- 21. Article 130: Work Involving Electrical Hazards
- 22. Section 130.5, Arc Flash Risk Assessment.
- 23. Section 130.7(C)(1) through (C)(8), Personal and Other Protective Equipment.
- 24. Section 130.7(C)(9) through (C)(15), Personal and Other Protective Equipment.
- 25. Section 130.7(C), Personal Protective Equipment (Tables).
- Electrical Safety (NFPA 70E 2024) Part 2 [15 Activities]
- 01. Section 130.7(D), Other Protective Equipment.
- 02. Section 130.8(A)-(D), Other Precautions for Personnel Activities.
- 03. Section 130.8(E)-(N), Other Precautions for Personnel Activities.
- 04. Section 130.8(O), Alerting Techniques.
- 05. Section 130.9, Work Within the Limited Approach Boundary or Arc Flash Boundary of Overhead Lines
- 06. CHAPTER 2: SAFETY-RELATED MAINTENANCE REQUIREMENTS.
- 07. Article 205: General (Requirements)
- 08. Article 210: Substations, Switchgear Assemblies, Switchboards, Panelboards, Motor Control Centers, and Disconnect Switches
- 09. Article 215: Premises Wiring
- 10. Article 220: Controller Equipment
- 11. Article 225: Fuses and Circuit Breakers
- 12. Article 230: Rotating Equipment
- 13. Article 235: Hazardous (Classified) Locations
- 14. Article 240: Batteries and Battery Rooms
- 15. Article 245: Portable Electric Tools and Equipment
- Electrical Safety (NFPA 70E 2024) Part 1 [25 Activities]
- Pump Installation and Maintenance [52 Activities]
- 01. Force and Work
- 02. Power and Horsepower
- 03. Energy
- 04. Velocity and Acceleration
- 05. Static Suction Lift
- 06. Pressure Losses: Friction and Vapor Pressure
- 07. Available and Required Net Positive Suction Head (NPSH)
- 08. Checking Pump Capacity and Pumping Hot Water
- 09. Computing Pump Power Requirements and Effects of Operational Factors
- 10. Priming a Pump
- 11. Uses and Types of Packing and Seals
- 12. Packing
- 13. Selecting Packing Material
- 14. Removing Old Packing
- 15. Installing New Packing
- 16. Testing New Packing and Packing Precautions
- 17. Mechanical Seals
- 18. Mechanical Seals Versus Packing
- 19. Types of Mechanical Seals
- 20. Installing Mechanical Seals
- 21. Maintaining and Troubleshooting Packing and Seals
- 22. Installing the Pump and Preparing the Foundation
- 23. Fabricated Steel Baseplates
- 24. Checking Shaft Alignment and Grouting the Baseplate
- 25. Mounting Pump and Motor Separately
- 26. Compensating for Heat and Installing Auxiliary Pump Drives
- 27. Maintaining Centrifugal Pumps
- 28. Inspecting Packing, Seals, and Bearings
- 29. Motor and Drive
- 30. Avoiding Common Pump Problems
- 31. Cavitation
- 32. Ring Seizure
- 33. Overheating
- 34. Pump Operation
- 35. Scheduling Maintenance and Troubleshooting
- 36. Preparation, Work Areas, and Rigging
- 37. Moving a Pump
- 38. Disassembling a Pump
- 39. Inspecting Pump Parts
- 40. Checking Clearances
- 41. Reassembling a Pump
- 42. Reinstalling a Pump
- 43. Types of Rotary Pumps
- 44. Gear-Type and Vane-Type Rotary Pumps
- 45. Axial-Flow Pumps
- 46. Installing Rotary Pumps
- 47. Aligning Pump and Piping
- 48. Direction of Rotation
- 49. Pump Start-Up
- 50. Maintaining Rotary Pumps
- 51. Scheduling Inspections and Maintenance
- 52. Troubleshooting Rotary Pumps
- Valve Maintenance and Piping System Protection [53 Activities]
- 01. Valve Materials
- 02. Threaded Connections
- 03. Welded and Brazed Connections
- 04. Flanged Connections
- 05. Valve Installation
- 06. Repairing Gate Valves
- 07. Repairing Globe and Angle Valves
- 08. Repairing Ball Valves
- 09. Maintaining Plug Valves
- 10. Maintaining Check Valves
- 11. General Maintenance
- 12. Special Valves
- 13. Butterfly Valves
- 14. Diaphragm Valves
- 15. Pop Safety Valves
- 16. Relief Valves
- 17. Safety Relief Valves
- 18. Pressure-Reducing and Regulating Valves
- 19. Quick-Opening Valves
- 20. Valve Actuators
- 21. Diaphragm Actuators
- 22. Piston Actuators
- 23. Electric Actuators
- 24. Actuator Installation
- 25. Actuator Maintenance and Repair
- 26. Bourdon Tube
- 27. Bimetallic Gauge
- 28. Bellows Gauge
- 29. Flowmeters
- 30. Rotating Unions
- 31. Accumulators
- 32. Air Receivers
- 33. Application Considerations and Studying the Total System
- 34. Valve Applications
- 35. Valve Materials
- 36. Valve Identification
- 37. Soldered Valve Connections
- 38. Threaded Valve Connections
- 39. Flanged Valve Connections
- 40. Tool Selection
- 41. Valve Location
- 42. Positioning the Valve
- 43. Protecting Hot Pipelines
- 44. Heat Conduction, Convection, and Radiation
- 45. Installing and Maintaining Insulation
- 46. Tracing
- 47. Installing Steam Tracers
- 48. Electric Tracing, Tracing Valves, and Fittings
- 49. Protection From Freezing
- 50. Protection From Corrosives
- 51. Active and Passive Protection
- 52. Inspection of Piping Protection
- 53. Hangers and Supports
Course Completion
- Mandatory Questionnaire
- Electrical Safety (NFPA 70E 2024) - Certificate of Achievement
- Pump Installation and Maintenance - Certificate of Achievement
- Valve Maintenance and Piping System Protection - Certificate of Achievement
