Save with our 20-Hour Package for Wastewater Operators. This package includes the following courses:

  • Wastewater Treatment Processes (2 hours)
  • Maintaining Wastewater Equipment (2 hours)
  • Pumps Part 1 (3 hours)
  • Pumps Part 2 (3 hours)
  • Pump Installation and Maintenance (3 hours)
  • Valve Maintenance and Piping System Protection (3 hours)
  • Electrical Safety Part 1 (2 hours)
  • Electrical Safety Part 2 (2 hours)

Course Format: Text

Credit Type: Wastewater, Drinking Water, Wastewater, Onsite Install, Onsite O&M, Wastewater, Drinking Water

Course ID(s): 7563, 6395, 7565, 7566, 7560, 6159, 6160, 6396

Approved By: Oregon Environmental Services Advisory Council (OESAC)

  • Valve Maintenance and Piping System Protection
    • Valve Maintenance and Piping System Protection [53 Activities]
      • 01. Valve Materials
      • 02. Threaded Connections
      • 03. Welded and Brazed Connections
      • 04. Flanged Connections
      • 05. Valve Installation
      • 06. Repairing Gate Valves
      • 07. Repairing Globe and Angle Valves
      • 08. Repairing Ball Valves
      • View Additional Activities
        • 09. Maintaining Plug Valves
        • 10. Maintaining Check Valves
        • 11. General Maintenance
        • 12. Special Valves
        • 13. Butterfly Valves
        • 14. Diaphragm Valves
        • 15. Pop Safety Valves
        • 16. Relief Valves
        • 17. Safety Relief Valves
        • 18. Pressure-Reducing and Regulating Valves
        • 19. Quick-Opening Valves
        • 20. Valve Actuators
        • 21. Diaphragm Actuators
        • 22. Piston Actuators
        • 23. Electric Actuators
        • 24. Actuator Installation
        • 25. Actuator Maintenance and Repair
        • 26. Bourdon Tube
        • 27. Bimetallic Gauge
        • 28. Bellows Gauge
        • 29. Flowmeters
        • 30. Rotating Unions
        • 31. Accumulators
        • 32. Air Receivers
        • 33. Application Considerations and Studying the Total System
        • 34. Valve Applications
        • 35. Valve Materials
        • 36. Valve Identification
        • 37. Soldered Valve Connections
        • 38. Threaded Valve Connections
        • 39. Flanged Valve Connections
        • 40. Tool Selection
        • 41. Valve Location
        • 42. Positioning the Valve
        • 43. Protecting Hot Pipelines
        • 44. Heat Conduction, Convection, and Radiation
        • 45. Installing and Maintaining Insulation
        • 46. Tracing
        • 47. Installing Steam Tracers
        • 48. Electric Tracing, Tracing Valves, and Fittings
        • 49. Protection From Freezing
        • 50. Protection From Corrosives
        • 51. Active and Passive Protection
        • 52. Inspection of Piping Protection
        • 53. Hangers and Supports
  • Pumps: Part 1
    • Pumps: Part 1 [42 Activities]
      • 01. The Development of Pumps
      • 02. Pumping Systems
      • 03. Water Pumping Systems
      • 04. Chemical Pumping Systems
      • 05. Waste Pumping Systems
      • 06. High-Viscosity Material Pumping Systems
      • 07. Solid Pumping Systems
      • 08. Pumping Terminology
      • View Additional Activities
        • 09. Calculating Total Head
        • 10. Horsepower Calculations
        • 11. Total Energy vs Available NPSH
        • 12. Available NPSH vs Required NPSH
        • 13. Pump Performance Curves
        • 14. Head Capacity Curves
        • 15. Curve Families
        • 16. Pump Selection
        • 17. Centrifugal Pumps
        • 18. Pump Part Definitions
        • 19. End-Suction Casing Configurations
        • 20. Split-Case Centrifugal Pumps
        • 21. Double-Volume Pumps
        • 22. Impeller Types
        • 23. Wear Rings
        • 24. Shafts, Bearings, and Sleeves
        • 25. Turbine Pumps Overview and Lineshaft Turbines
        • 26. Can Turbines
        • 27. Submersible Turbines
        • 28. Flow Patterns
        • 29. Axial-Flow Propeller Pumps
        • 30. Mixed-Flow Propeller Pumps
        • 31. Special Propeller Pumps and Turbine Pump Construction
        • 32. Vertical Turbine Pump Application
        • 33. Regenerative Turbine Pumps
        • 34. Introduction to Rotary Pumps
        • 35. External-Gear Pumps
        • 36. Internal-Gear Pumps
        • 37. Lobe Pumps
        • 38. Screw Pumps
        • 39. Vane Pumps
        • 40. Rotary Piston Pumps
        • 41. Flexible-Members Pumps
        • 42. Rotary Pump Installations
  • Pumps: Part 2
    • Pumps: Part 2 [41 Activities]
      • 01. Reciprocating Pump Applications
      • 02. Reciprocating Pump Parts
      • 03. Reciprocating Pump Classifications
      • 04. Steam-Driven Pump Operation
      • 05. Power Pump Operations
      • 06. Horizontal Plunger Pumps
      • 07. Vertical Plunger Pumps
      • 08. Air-Driven Pump Operations
      • View Additional Activities
        • 09. Introduction to Metering Pumps
        • 10. Metering Pump Classification
        • 11. Plunger and Piston Metering Pumps
        • 12. Diaphragm Pumps
        • 13. Air-Operated Metering Pumps
        • 14. Rotary Metering Pumps
        • 15. Handling Difficult Materials
        • 16. Chemical Pumps
        • 17. Special Chemical Pumps
        • 18. Magnetic-Drive Pumps
        • 19. Canned-Motor Pumps
        • 20. Centrifugal Slurry Pumps
        • 21. Pulp-Handling Pumps
        • 22. Trash and Sewage Pumps
        • 23. Diaphragm Pumps
        • 24. Reciprocating Slurry Pumps
        • 25. Vortex Pumps
        • 26. Pump Sealing Requirements
        • 27. Stuffing Boxes
        • 28. Packing Materials
        • 29. Installing Packing
        • 30. Mechanical Seals
        • 31. Special Seals
        • 32. Pump and Sleeve Bearings
        • 33. Antifriction and Special Bearings
        • 34. Bearing Lubrication
        • 35. Bearing Seals
        • 36. Pump Installation and Maintenance
        • 37. End-Suction Centrifugal Pumps
        • 38. Vertical Turbine Pumps
        • 39. Rotary Pumps
        • 40. Reciprocating Pumps
        • 41. Difficult Material Pumps and Other Maintenance Problems
  • Wastewater Treatment Processes
    • Wastewater Treatment Processes [46 Activities]
      • 01. Purpose of Treatment
      • 02. Sources of Wastewater
      • 03. Wastewater Collection Systems
      • 04. Typical Treatment Facilities
      • 05. Influent
      • 06. Preliminary Treatment
      • 07. Primary Treatment
      • 08. Secondary Treatment
      • View Additional Activities
        • 09. Tertiary Treatment
        • 10. Disinfection and Effluent Discharge
        • 11. Solids Handling
        • 12. Screening
        • 13. Grinding
        • 14. Grit Removal
        • 15. Sedimentation
        • 16. Factors Affecting Settling Rates
        • 17. Types of Clarifiers
        • 18. Air Flotation
        • 19. Filtration and Effluent Disposal
        • 20. Solids in Wastewater
        • 21. Chemical Coagulants
        • 22. Phosphorus Removal
        • 23. Chemical Clarification Equipment
        • 24. Disinfection
        • 25. Factors Affecting Disinfection
        • 26. Disinfection with Chlorine
        • 27. Equipment Used in Chlorine Feeding
        • 28. Lagoons
        • 29. Activated Sludge
        • 30. Aeration with Pure Oxygen
        • 31. Trickling Filters
        • 32. Distribution Systems
        • 33. Trickling Filter Operations
        • 34. Synthetic Media
        • 35. Activated Biofilter Processes (ABF)
        • 36. Rotating Biological Contactors (RBC)
        • 37. Secondary Clarifiers
        • 38. Three Processes
        • 39. Sludge Conditioning
        • 40. Thickening and Dewatering
        • 41. Drying Beds
        • 42. Lagoons
        • 43. Vacuum Filtration and Filter Presses
        • 44. Further Reduction of Water Content
        • 45. Composting
        • 46. Ultimate Disposal
  • Maintaining Wastewater Equipment
    • Maintaining Wastewater Equipment [41 Activities]
      • 01. Collection Systems
      • 02. Pumping Stations
      • 03. Pump Operations
      • 04. Pump Types
      • 05. Pump Maintenance
      • 06. Pump Drive Units
      • 07. Piping, Ventilation, and Control Systems
      • 08. Level Detection
      • View Additional Activities
        • 09. Station Operation and Maintenance
        • 10. Safety Considerations
        • 11. Hand-Cleaned Bar Screens
        • 12. Mechanically Cleaned Bar Screens
        • 13. Grinders
        • 14. Rotating Drum Comminutors
        • 15. Stationary Screen Comminutors
        • 16. Barminutors
        • 17. The Nature of Grit
        • 18. Hand-Cleaned Grit Chambers
        • 19. Maintaining Hand-Cleaned Grit Chambers
        • 20. Detritus Tanks
        • 21. Maintaining Detritus Tanks
        • 22. Chain and Flight Grit Collectors
        • 23. Maintaining Chain and Flight Grit Collectors
        • 24. Aerated Grit Chambers and Cyclone Separators
        • 25. Maintaining Aerated Grit Chambers
        • 26. Sedimentation
        • 27. Rectangular Clarifiers
        • 28. Scum Removal
        • 29. Circular Clarifiers
        • 30. Sludge Removal
        • 31. Laboratory Testing
        • 32. Troubleshooting
        • 33. Safety Considerations
        • 34. Properties of Flowing Liquids
        • 35. Flow Measurement Methods, Including Batch Processes
        • 36. Flow Measurement in Open Channels
        • 37. Measuring Flow from Freely Discharging Pipes
        • 38. Methods of Depth Measurement
        • 39. Flow Measurement in Completely Filled Pipes
        • 40. Methods of Pressure Measurement
        • 41. Maintenance of Flow Measurement Devices
  • Electrical Safety (NFPA 70E 2024) Part 1
    • Electrical Safety (NFPA 70E 2024) Part 1 [13 Activities]
      • 01. Article 90: Sections 90.1, 90.2, 90.3
      • 02. Article 90: Sections 90.4, 90.5, 90.6
      • 03. Article 100 Definitions
      • 04. Article 105, Application of Safety-Related Work Practices and Procedures
      • 05. Article 110, General Requirements for Electrical Safety-Related Work Practices
      • 06. Section 110.3, Electrical Safety Program.
      • 07. Section 110.4, Training Requirements.
      • 08. Section 110.5 Host and Contract Employers’ Responsibilities.
      • View Additional Activities
        • 09. Section 110.6, Test Instruments and Equipment.
        • 10. Section 110.7(A)&(B), ?Portable Cord- and-Plug-Connected Electric Equipment.
        • 11. Section 110.7(C)-(F), ?Portable Cord- and-Plug-Connected Electric Equipment.
        • 12. Section 110.8, ?Ground-Fault Circuit-Interrupter (GFCI) Protection.
        • 13. Sections 110.8, Ground-Fault Circuit-Interrupter (GFCI) Protection. 110.9?Overcurrent Protection Modification. 110.10?Equipment Use.
  • Electrical Safety (NFPA 70E 2024) Part 2
    • Electrical Safety (NFPA 70E 2024) Part 2 [12 Activities]
      • 01. Article 120, Establishing an Electrically Safe Work Condition
      • 02. Section 120.2, Lockout/Tagout Program.
      • 03. Section 120.3, Lockout/Tagout Principles.
      • 04. Section 120.4, Lockout/Tagout Equipment.
      • 05. Section 120.5?Lockout/Tagout Procedures PART-I.
      • 06. Section 120.5 Lockout/Tagout Procedures PART-II.
      • 07. Section 120.6, Process for Establishing and Verifying an Electrically Safe Work Condition.
      • 08. Article 130: Work Involving Electrical Hazards
      • View Additional Activities
        • 09. Section 130.5, Arc Flash Risk Assessment.
        • 10. Section 130.7(C)(1) through (C)(8),?Personal and Other Protective Equipment.
        • 11. Section 130.7(C)(9) through (C)(15),?Personal and Other Protective Equipment.
        • 12. Section 130.7(C). Personal Protective Equipment (Tables).
  • Pump Installation and Maintenance
    • Pump Installation and Maintenance [52 Activities]
      • 01. Force and Work
      • 02. Power and Horsepower
      • 03. Energy
      • 04. Velocity and Acceleration
      • 05. Static Suction Lift
      • 06. Pressure Losses: Friction and Vapor Pressure
      • 07. Available and Required Net Positive Suction Head (NPSH)
      • 08. Checking Pump Capacity and Pumping Hot Water
      • View Additional Activities
        • 09. Computing Pump Power Requirements and Effects of Operational Factors
        • 10. Priming a Pump
        • 11. Uses and Types of Packing and Seals
        • 12. Packing
        • 13. Selecting Packing Material
        • 14. Removing Old Packing
        • 15. Installing New Packing
        • 16. Testing New Packing and Packing Precautions
        • 17. Mechanical Seals
        • 18. Mechanical Seals Versus Packing
        • 19. Types of Mechanical Seals
        • 20. Installing Mechanical Seals
        • 21. Maintaining and Troubleshooting Packing and Seals
        • 22. Installing the Pump and Preparing the Foundation
        • 23. Fabricated Steel Baseplates
        • 24. Checking Shaft Alignment and Grouting the Baseplate
        • 25. Mounting Pump and Motor Separately
        • 26. Compensating for Heat and Installing Auxiliary Pump Drives
        • 27. Maintaining Centrifugal Pumps
        • 28. Inspecting Packing, Seals, and Bearings
        • 29. Motor and Drive
        • 30. Avoiding Common Pump Problems
        • 31. Cavitation
        • 32. Ring Seizure
        • 33. Overheating
        • 34. Pump Operation
        • 35. Scheduling Maintenance and Troubleshooting
        • 36. Preparation, Work Areas, and Rigging
        • 37. Moving a Pump
        • 38. Disassembling a Pump
        • 39. Inspecting Pump Parts
        • 40. Checking Clearances
        • 41. Reassembling a Pump
        • 42. Reinstalling a Pump
        • 43. Types of Rotary Pumps
        • 44. Gear-Type and Vane-Type Rotary Pumps
        • 45. Axial-Flow Pumps
        • 46. Installing Rotary Pumps
        • 47. Aligning Pump and Piping
        • 48. Direction of Rotation
        • 49. Pump Start-Up
        • 50. Maintaining Rotary Pumps
        • 51. Scheduling Inspections and Maintenance
        • 52. Troubleshooting Rotary Pumps
  • Course Completion
    • Mandatory Questionnaire
    • Valve Maintenance and Piping System Protection - Certificate of Achievement (1 of 8)
    • Pumps: Part 1 - Certificate of Achievement (2 of 8)
    • Pumps: Part 2 - Certificate of Achievement (3 of 8)
    • Wastewater Treatment Processes - Certificate of Achievement (4 of 8)
    • Maintaining Wastewater Equipment - Certificate of Achievement (5 of 8)
    • Electrical Safety (NFPA 70E 2024) Part 1 - Certificate of Achievement (6 of 8)
    • Electrical Safety (NFPA 70E 2024) Part 2 - Certificate of Achievement (7 of 8)
    • Pump Installation and Maintenance - Certificate of Achievement (8 of 8)
    • Guaranteed Next Business Day Reporting