Save with our 20-Hour Package for Wastewater Operators. This package includes the following courses:
- Wastewater Treatment Processes (2 hours)
- Maintaining Wastewater Equipment (2 hours)
- Pumps Part 1 (3 hours)
- Pumps Part 2 (3 hours)
- Pump Installation and Maintenance (3 hours)
- Valve Maintenance and Piping System Protection (3 hours)
- Electrical Safety Part 1 (2 hours)
- Electrical Safety Part 2 (2 hours)
Approved By: Division of Unregulated Administration Bureau Commission Office
- Valve Maintenance and Piping System Protection
- Valve Maintenance and Piping System Protection [53 Activities]
- 01. Valve Materials
- 02. Threaded Connections
- 03. Welded and Brazed Connections
- 04. Flanged Connections
- 05. Valve Installation
- 06. Repairing Gate Valves
- 07. Repairing Globe and Angle Valves
- 08. Repairing Ball Valves
- View Additional Activities
- 09. Maintaining Plug Valves
- 10. Maintaining Check Valves
- 11. General Maintenance
- 12. Special Valves
- 13. Butterfly Valves
- 14. Diaphragm Valves
- 15. Pop Safety Valves
- 16. Relief Valves
- 17. Safety Relief Valves
- 18. Pressure-Reducing and Regulating Valves
- 19. Quick-Opening Valves
- 20. Valve Actuators
- 21. Diaphragm Actuators
- 22. Piston Actuators
- 23. Electric Actuators
- 24. Actuator Installation
- 25. Actuator Maintenance and Repair
- 26. Bourdon Tube
- 27. Bimetallic Gauge
- 28. Bellows Gauge
- 29. Flowmeters
- 30. Rotating Unions
- 31. Accumulators
- 32. Air Receivers
- 33. Application Considerations and Studying the Total System
- 34. Valve Applications
- 35. Valve Materials
- 36. Valve Identification
- 37. Soldered Valve Connections
- 38. Threaded Valve Connections
- 39. Flanged Valve Connections
- 40. Tool Selection
- 41. Valve Location
- 42. Positioning the Valve
- 43. Protecting Hot Pipelines
- 44. Heat Conduction, Convection, and Radiation
- 45. Installing and Maintaining Insulation
- 46. Tracing
- 47. Installing Steam Tracers
- 48. Electric Tracing, Tracing Valves, and Fittings
- 49. Protection From Freezing
- 50. Protection From Corrosives
- 51. Active and Passive Protection
- 52. Inspection of Piping Protection
- 53. Hangers and Supports
- Valve Maintenance and Piping System Protection [53 Activities]
- Pumps: Part 1
- Pumps: Part 1 [42 Activities]
- 01. The Development of Pumps
- 02. Pumping Systems
- 03. Water Pumping Systems
- 04. Chemical Pumping Systems
- 05. Waste Pumping Systems
- 06. High-Viscosity Material Pumping Systems
- 07. Solid Pumping Systems
- 08. Pumping Terminology
- View Additional Activities
- 09. Calculating Total Head
- 10. Horsepower Calculations
- 11. Total Energy vs Available NPSH
- 12. Available NPSH vs Required NPSH
- 13. Pump Performance Curves
- 14. Head Capacity Curves
- 15. Curve Families
- 16. Pump Selection
- 17. Centrifugal Pumps
- 18. Pump Part Definitions
- 19. End-Suction Casing Configurations
- 20. Split-Case Centrifugal Pumps
- 21. Double-Volume Pumps
- 22. Impeller Types
- 23. Wear Rings
- 24. Shafts, Bearings, and Sleeves
- 25. Turbine Pumps Overview and Lineshaft Turbines
- 26. Can Turbines
- 27. Submersible Turbines
- 28. Flow Patterns
- 29. Axial-Flow Propeller Pumps
- 30. Mixed-Flow Propeller Pumps
- 31. Special Propeller Pumps and Turbine Pump Construction
- 32. Vertical Turbine Pump Application
- 33. Regenerative Turbine Pumps
- 34. Introduction to Rotary Pumps
- 35. External-Gear Pumps
- 36. Internal-Gear Pumps
- 37. Lobe Pumps
- 38. Screw Pumps
- 39. Vane Pumps
- 40. Rotary Piston Pumps
- 41. Flexible-Members Pumps
- 42. Rotary Pump Installations
- Pumps: Part 1 [42 Activities]
- Pumps: Part 2
- Pumps: Part 2 [41 Activities]
- 01. Reciprocating Pump Applications
- 02. Reciprocating Pump Parts
- 03. Reciprocating Pump Classifications
- 04. Steam-Driven Pump Operation
- 05. Power Pump Operations
- 06. Horizontal Plunger Pumps
- 07. Vertical Plunger Pumps
- 08. Air-Driven Pump Operations
- View Additional Activities
- 09. Introduction to Metering Pumps
- 10. Metering Pump Classification
- 11. Plunger and Piston Metering Pumps
- 12. Diaphragm Pumps
- 13. Air-Operated Metering Pumps
- 14. Rotary Metering Pumps
- 15. Handling Difficult Materials
- 16. Chemical Pumps
- 17. Special Chemical Pumps
- 18. Magnetic-Drive Pumps
- 19. Canned-Motor Pumps
- 20. Centrifugal Slurry Pumps
- 21. Pulp-Handling Pumps
- 22. Trash and Sewage Pumps
- 23. Diaphragm Pumps
- 24. Reciprocating Slurry Pumps
- 25. Vortex Pumps
- 26. Pump Sealing Requirements
- 27. Stuffing Boxes
- 28. Packing Materials
- 29. Installing Packing
- 30. Mechanical Seals
- 31. Special Seals
- 32. Pump and Sleeve Bearings
- 33. Antifriction and Special Bearings
- 34. Bearing Lubrication
- 35. Bearing Seals
- 36. Pump Installation and Maintenance
- 37. End-Suction Centrifugal Pumps
- 38. Vertical Turbine Pumps
- 39. Rotary Pumps
- 40. Reciprocating Pumps
- 41. Difficult Material Pumps and Other Maintenance Problems
- Pumps: Part 2 [41 Activities]
- Wastewater Treatment Processes
- Wastewater Treatment Processes [46 Activities]
- 01. Purpose of Treatment
- 02. Sources of Wastewater
- 03. Wastewater Collection Systems
- 04. Typical Treatment Facilities
- 05. Influent
- 06. Preliminary Treatment
- 07. Primary Treatment
- 08. Secondary Treatment
- View Additional Activities
- 09. Tertiary Treatment
- 10. Disinfection and Effluent Discharge
- 11. Solids Handling
- 12. Screening
- 13. Grinding
- 14. Grit Removal
- 15. Sedimentation
- 16. Factors Affecting Settling Rates
- 17. Types of Clarifiers
- 18. Air Flotation
- 19. Filtration and Effluent Disposal
- 20. Solids in Wastewater
- 21. Chemical Coagulants
- 22. Phosphorus Removal
- 23. Chemical Clarification Equipment
- 24. Disinfection
- 25. Factors Affecting Disinfection
- 26. Disinfection with Chlorine
- 27. Equipment Used in Chlorine Feeding
- 28. Lagoons
- 29. Activated Sludge
- 30. Aeration with Pure Oxygen
- 31. Trickling Filters
- 32. Distribution Systems
- 33. Trickling Filter Operations
- 34. Synthetic Media
- 35. Activated Biofilter Processes (ABF)
- 36. Rotating Biological Contactors (RBC)
- 37. Secondary Clarifiers
- 38. Three Processes
- 39. Sludge Conditioning
- 40. Thickening and Dewatering
- 41. Drying Beds
- 42. Lagoons
- 43. Vacuum Filtration and Filter Presses
- 44. Further Reduction of Water Content
- 45. Composting
- 46. Ultimate Disposal
- Wastewater Treatment Processes [46 Activities]
- Maintaining Wastewater Equipment
- Maintaining Wastewater Equipment [41 Activities]
- 01. Collection Systems
- 02. Pumping Stations
- 03. Pump Operations
- 04. Pump Types
- 05. Pump Maintenance
- 06. Pump Drive Units
- 07. Piping, Ventilation, and Control Systems
- 08. Level Detection
- View Additional Activities
- 09. Station Operation and Maintenance
- 10. Safety Considerations
- 11. Hand-Cleaned Bar Screens
- 12. Mechanically Cleaned Bar Screens
- 13. Grinders
- 14. Rotating Drum Comminutors
- 15. Stationary Screen Comminutors
- 16. Barminutors
- 17. The Nature of Grit
- 18. Hand-Cleaned Grit Chambers
- 19. Maintaining Hand-Cleaned Grit Chambers
- 20. Detritus Tanks
- 21. Maintaining Detritus Tanks
- 22. Chain and Flight Grit Collectors
- 23. Maintaining Chain and Flight Grit Collectors
- 24. Aerated Grit Chambers and Cyclone Separators
- 25. Maintaining Aerated Grit Chambers
- 26. Sedimentation
- 27. Rectangular Clarifiers
- 28. Scum Removal
- 29. Circular Clarifiers
- 30. Sludge Removal
- 31. Laboratory Testing
- 32. Troubleshooting
- 33. Safety Considerations
- 34. Properties of Flowing Liquids
- 35. Flow Measurement Methods, Including Batch Processes
- 36. Flow Measurement in Open Channels
- 37. Measuring Flow from Freely Discharging Pipes
- 38. Methods of Depth Measurement
- 39. Flow Measurement in Completely Filled Pipes
- 40. Methods of Pressure Measurement
- 41. Maintenance of Flow Measurement Devices
- Maintaining Wastewater Equipment [41 Activities]
- Electrical Safety (NFPA 70E 2024) Part 1
- Electrical Safety (NFPA 70E 2024) Part 1 [13 Activities]
- 01. Article 90: Sections 90.1, 90.2, 90.3
- 02. Article 90: Sections 90.4, 90.5, 90.6
- 03. Article 100 Definitions
- 04. Article 105, Application of Safety-Related Work Practices and Procedures
- 05. Article 110, General Requirements for Electrical Safety-Related Work Practices
- 06. Section 110.3, Electrical Safety Program.
- 07. Section 110.4, Training Requirements.
- 08. Section 110.5 Host and Contract Employers Responsibilities.
- View Additional Activities
- 09. Section 110.6, Test Instruments and Equipment.
- 10. Section 110.7(A)&(B), ?Portable Cord- and-Plug-Connected Electric Equipment.
- 11. Section 110.7(C)-(F), ?Portable Cord- and-Plug-Connected Electric Equipment.
- 12. Section 110.8, ?Ground-Fault Circuit-Interrupter (GFCI) Protection.
- 13. Sections 110.8, Ground-Fault Circuit-Interrupter (GFCI) Protection. 110.9?Overcurrent Protection Modification. 110.10?Equipment Use.
- Electrical Safety (NFPA 70E 2024) Part 1 [13 Activities]
- Electrical Safety (NFPA 70E 2024) Part 2
- Electrical Safety (NFPA 70E 2024) Part 2 [12 Activities]
- 01. Article 120, Establishing an Electrically Safe Work Condition
- 02. Section 120.2, Lockout/Tagout Program.
- 03. Section 120.3, Lockout/Tagout Principles.
- 04. Section 120.4, Lockout/Tagout Equipment.
- 05. Section 120.5?Lockout/Tagout Procedures PART-I.
- 06. Section 120.5 Lockout/Tagout Procedures PART-II.
- 07. Section 120.6, Process for Establishing and Verifying an Electrically Safe Work Condition.
- 08. Article 130: Work Involving Electrical Hazards
- View Additional Activities
- 09. Section 130.5, Arc Flash Risk Assessment.
- 10. Section 130.7(C)(1) through (C)(8),?Personal and Other Protective Equipment.
- 11. Section 130.7(C)(9) through (C)(15),?Personal and Other Protective Equipment.
- 12. Section 130.7(C). Personal Protective Equipment (Tables).
- Electrical Safety (NFPA 70E 2024) Part 2 [12 Activities]
- Pump Installation and Maintenance
- Pump Installation and Maintenance [52 Activities]
- 01. Force and Work
- 02. Power and Horsepower
- 03. Energy
- 04. Velocity and Acceleration
- 05. Static Suction Lift
- 06. Pressure Losses: Friction and Vapor Pressure
- 07. Available and Required Net Positive Suction Head (NPSH)
- 08. Checking Pump Capacity and Pumping Hot Water
- View Additional Activities
- 09. Computing Pump Power Requirements and Effects of Operational Factors
- 10. Priming a Pump
- 11. Uses and Types of Packing and Seals
- 12. Packing
- 13. Selecting Packing Material
- 14. Removing Old Packing
- 15. Installing New Packing
- 16. Testing New Packing and Packing Precautions
- 17. Mechanical Seals
- 18. Mechanical Seals Versus Packing
- 19. Types of Mechanical Seals
- 20. Installing Mechanical Seals
- 21. Maintaining and Troubleshooting Packing and Seals
- 22. Installing the Pump and Preparing the Foundation
- 23. Fabricated Steel Baseplates
- 24. Checking Shaft Alignment and Grouting the Baseplate
- 25. Mounting Pump and Motor Separately
- 26. Compensating for Heat and Installing Auxiliary Pump Drives
- 27. Maintaining Centrifugal Pumps
- 28. Inspecting Packing, Seals, and Bearings
- 29. Motor and Drive
- 30. Avoiding Common Pump Problems
- 31. Cavitation
- 32. Ring Seizure
- 33. Overheating
- 34. Pump Operation
- 35. Scheduling Maintenance and Troubleshooting
- 36. Preparation, Work Areas, and Rigging
- 37. Moving a Pump
- 38. Disassembling a Pump
- 39. Inspecting Pump Parts
- 40. Checking Clearances
- 41. Reassembling a Pump
- 42. Reinstalling a Pump
- 43. Types of Rotary Pumps
- 44. Gear-Type and Vane-Type Rotary Pumps
- 45. Axial-Flow Pumps
- 46. Installing Rotary Pumps
- 47. Aligning Pump and Piping
- 48. Direction of Rotation
- 49. Pump Start-Up
- 50. Maintaining Rotary Pumps
- 51. Scheduling Inspections and Maintenance
- 52. Troubleshooting Rotary Pumps
- Pump Installation and Maintenance [52 Activities]
- Course Completion
- Mandatory Questionnaire
- Valve Maintenance and Piping System Protection - Certificate of Achievement (1 of 8)
- Pumps: Part 1 - Certificate of Achievement (2 of 8)
- Pumps: Part 2 - Certificate of Achievement (3 of 8)
- Wastewater Treatment Processes - Certificate of Achievement (4 of 8)
- Maintaining Wastewater Equipment - Certificate of Achievement (5 of 8)
- Electrical Safety (NFPA 70E 2024) Part 1 - Certificate of Achievement (6 of 8)
- Electrical Safety (NFPA 70E 2024) Part 2 - Certificate of Achievement (7 of 8)
- Pump Installation and Maintenance - Certificate of Achievement (8 of 8)
- Guaranteed Next Business Day Reporting

