Save with our 20-Hour Package for Wastewater Operators. This package includes the following courses:

  • Wastewater Treatment Processes (2 hours)
  • Maintaining Wastewater Equipment (2 hours)
  • Pumps Part 1 (3 hours)
  • Pumps Part 2 (3 hours)
  • Pump Installation and Maintenance (3 hours)
  • Valve Maintenance and Piping System Protection (3 hours)
  • Electrical Safety Part 1 (2 hours)
  • Electrical Safety Part 2 (2 hours)

Approved By: Division of Unregulated Administration Bureau Commission Office

  • Valve Maintenance and Piping System Protection
    • Valve Maintenance and Piping System Protection [53 Activities]
      • 01. Valve Materials
      • 02. Threaded Connections
      • 03. Welded and Brazed Connections
      • 04. Flanged Connections
      • 05. Valve Installation
      • 06. Repairing Gate Valves
      • 07. Repairing Globe and Angle Valves
      • 08. Repairing Ball Valves
      • View Additional Activities
        • 09. Maintaining Plug Valves
        • 10. Maintaining Check Valves
        • 11. General Maintenance
        • 12. Special Valves
        • 13. Butterfly Valves
        • 14. Diaphragm Valves
        • 15. Pop Safety Valves
        • 16. Relief Valves
        • 17. Safety Relief Valves
        • 18. Pressure-Reducing and Regulating Valves
        • 19. Quick-Opening Valves
        • 20. Valve Actuators
        • 21. Diaphragm Actuators
        • 22. Piston Actuators
        • 23. Electric Actuators
        • 24. Actuator Installation
        • 25. Actuator Maintenance and Repair
        • 26. Bourdon Tube
        • 27. Bimetallic Gauge
        • 28. Bellows Gauge
        • 29. Flowmeters
        • 30. Rotating Unions
        • 31. Accumulators
        • 32. Air Receivers
        • 33. Application Considerations and Studying the Total System
        • 34. Valve Applications
        • 35. Valve Materials
        • 36. Valve Identification
        • 37. Soldered Valve Connections
        • 38. Threaded Valve Connections
        • 39. Flanged Valve Connections
        • 40. Tool Selection
        • 41. Valve Location
        • 42. Positioning the Valve
        • 43. Protecting Hot Pipelines
        • 44. Heat Conduction, Convection, and Radiation
        • 45. Installing and Maintaining Insulation
        • 46. Tracing
        • 47. Installing Steam Tracers
        • 48. Electric Tracing, Tracing Valves, and Fittings
        • 49. Protection From Freezing
        • 50. Protection From Corrosives
        • 51. Active and Passive Protection
        • 52. Inspection of Piping Protection
        • 53. Hangers and Supports
  • Pumps: Part 1
    • Pumps: Part 1 [42 Activities]
      • 01. The Development of Pumps
      • 02. Pumping Systems
      • 03. Water Pumping Systems
      • 04. Chemical Pumping Systems
      • 05. Waste Pumping Systems
      • 06. High-Viscosity Material Pumping Systems
      • 07. Solid Pumping Systems
      • 08. Pumping Terminology
      • View Additional Activities
        • 09. Calculating Total Head
        • 10. Horsepower Calculations
        • 11. Total Energy vs Available NPSH
        • 12. Available NPSH vs Required NPSH
        • 13. Pump Performance Curves
        • 14. Head Capacity Curves
        • 15. Curve Families
        • 16. Pump Selection
        • 17. Centrifugal Pumps
        • 18. Pump Part Definitions
        • 19. End-Suction Casing Configurations
        • 20. Split-Case Centrifugal Pumps
        • 21. Double-Volume Pumps
        • 22. Impeller Types
        • 23. Wear Rings
        • 24. Shafts, Bearings, and Sleeves
        • 25. Turbine Pumps Overview and Lineshaft Turbines
        • 26. Can Turbines
        • 27. Submersible Turbines
        • 28. Flow Patterns
        • 29. Axial-Flow Propeller Pumps
        • 30. Mixed-Flow Propeller Pumps
        • 31. Special Propeller Pumps and Turbine Pump Construction
        • 32. Vertical Turbine Pump Application
        • 33. Regenerative Turbine Pumps
        • 34. Introduction to Rotary Pumps
        • 35. External-Gear Pumps
        • 36. Internal-Gear Pumps
        • 37. Lobe Pumps
        • 38. Screw Pumps
        • 39. Vane Pumps
        • 40. Rotary Piston Pumps
        • 41. Flexible-Members Pumps
        • 42. Rotary Pump Installations
  • Pumps: Part 2
    • Pumps: Part 2 [41 Activities]
      • 01. Reciprocating Pump Applications
      • 02. Reciprocating Pump Parts
      • 03. Reciprocating Pump Classifications
      • 04. Steam-Driven Pump Operation
      • 05. Power Pump Operations
      • 06. Horizontal Plunger Pumps
      • 07. Vertical Plunger Pumps
      • 08. Air-Driven Pump Operations
      • View Additional Activities
        • 09. Introduction to Metering Pumps
        • 10. Metering Pump Classification
        • 11. Plunger and Piston Metering Pumps
        • 12. Diaphragm Pumps
        • 13. Air-Operated Metering Pumps
        • 14. Rotary Metering Pumps
        • 15. Handling Difficult Materials
        • 16. Chemical Pumps
        • 17. Special Chemical Pumps
        • 18. Magnetic-Drive Pumps
        • 19. Canned-Motor Pumps
        • 20. Centrifugal Slurry Pumps
        • 21. Pulp-Handling Pumps
        • 22. Trash and Sewage Pumps
        • 23. Diaphragm Pumps
        • 24. Reciprocating Slurry Pumps
        • 25. Vortex Pumps
        • 26. Pump Sealing Requirements
        • 27. Stuffing Boxes
        • 28. Packing Materials
        • 29. Installing Packing
        • 30. Mechanical Seals
        • 31. Special Seals
        • 32. Pump and Sleeve Bearings
        • 33. Antifriction and Special Bearings
        • 34. Bearing Lubrication
        • 35. Bearing Seals
        • 36. Pump Installation and Maintenance
        • 37. End-Suction Centrifugal Pumps
        • 38. Vertical Turbine Pumps
        • 39. Rotary Pumps
        • 40. Reciprocating Pumps
        • 41. Difficult Material Pumps and Other Maintenance Problems
  • Wastewater Treatment Processes
    • Wastewater Treatment Processes [46 Activities]
      • 01. Purpose of Treatment
      • 02. Sources of Wastewater
      • 03. Wastewater Collection Systems
      • 04. Typical Treatment Facilities
      • 05. Influent
      • 06. Preliminary Treatment
      • 07. Primary Treatment
      • 08. Secondary Treatment
      • View Additional Activities
        • 09. Tertiary Treatment
        • 10. Disinfection and Effluent Discharge
        • 11. Solids Handling
        • 12. Screening
        • 13. Grinding
        • 14. Grit Removal
        • 15. Sedimentation
        • 16. Factors Affecting Settling Rates
        • 17. Types of Clarifiers
        • 18. Air Flotation
        • 19. Filtration and Effluent Disposal
        • 20. Solids in Wastewater
        • 21. Chemical Coagulants
        • 22. Phosphorus Removal
        • 23. Chemical Clarification Equipment
        • 24. Disinfection
        • 25. Factors Affecting Disinfection
        • 26. Disinfection with Chlorine
        • 27. Equipment Used in Chlorine Feeding
        • 28. Lagoons
        • 29. Activated Sludge
        • 30. Aeration with Pure Oxygen
        • 31. Trickling Filters
        • 32. Distribution Systems
        • 33. Trickling Filter Operations
        • 34. Synthetic Media
        • 35. Activated Biofilter Processes (ABF)
        • 36. Rotating Biological Contactors (RBC)
        • 37. Secondary Clarifiers
        • 38. Three Processes
        • 39. Sludge Conditioning
        • 40. Thickening and Dewatering
        • 41. Drying Beds
        • 42. Lagoons
        • 43. Vacuum Filtration and Filter Presses
        • 44. Further Reduction of Water Content
        • 45. Composting
        • 46. Ultimate Disposal
  • Maintaining Wastewater Equipment
    • Maintaining Wastewater Equipment [41 Activities]
      • 01. Collection Systems
      • 02. Pumping Stations
      • 03. Pump Operations
      • 04. Pump Types
      • 05. Pump Maintenance
      • 06. Pump Drive Units
      • 07. Piping, Ventilation, and Control Systems
      • 08. Level Detection
      • View Additional Activities
        • 09. Station Operation and Maintenance
        • 10. Safety Considerations
        • 11. Hand-Cleaned Bar Screens
        • 12. Mechanically Cleaned Bar Screens
        • 13. Grinders
        • 14. Rotating Drum Comminutors
        • 15. Stationary Screen Comminutors
        • 16. Barminutors
        • 17. The Nature of Grit
        • 18. Hand-Cleaned Grit Chambers
        • 19. Maintaining Hand-Cleaned Grit Chambers
        • 20. Detritus Tanks
        • 21. Maintaining Detritus Tanks
        • 22. Chain and Flight Grit Collectors
        • 23. Maintaining Chain and Flight Grit Collectors
        • 24. Aerated Grit Chambers and Cyclone Separators
        • 25. Maintaining Aerated Grit Chambers
        • 26. Sedimentation
        • 27. Rectangular Clarifiers
        • 28. Scum Removal
        • 29. Circular Clarifiers
        • 30. Sludge Removal
        • 31. Laboratory Testing
        • 32. Troubleshooting
        • 33. Safety Considerations
        • 34. Properties of Flowing Liquids
        • 35. Flow Measurement Methods, Including Batch Processes
        • 36. Flow Measurement in Open Channels
        • 37. Measuring Flow from Freely Discharging Pipes
        • 38. Methods of Depth Measurement
        • 39. Flow Measurement in Completely Filled Pipes
        • 40. Methods of Pressure Measurement
        • 41. Maintenance of Flow Measurement Devices
  • Electrical Safety (NFPA 70E 2024) Part 1
    • Electrical Safety (NFPA 70E 2024) Part 1 [13 Activities]
      • 01. Article 90: Sections 90.1, 90.2, 90.3
      • 02. Article 90: Sections 90.4, 90.5, 90.6
      • 03. Article 100 Definitions
      • 04. Article 105, Application of Safety-Related Work Practices and Procedures
      • 05. Article 110, General Requirements for Electrical Safety-Related Work Practices
      • 06. Section 110.3, Electrical Safety Program.
      • 07. Section 110.4, Training Requirements.
      • 08. Section 110.5 Host and Contract Employers’ Responsibilities.
      • View Additional Activities
        • 09. Section 110.6, Test Instruments and Equipment.
        • 10. Section 110.7(A)&(B), ?Portable Cord- and-Plug-Connected Electric Equipment.
        • 11. Section 110.7(C)-(F), ?Portable Cord- and-Plug-Connected Electric Equipment.
        • 12. Section 110.8, ?Ground-Fault Circuit-Interrupter (GFCI) Protection.
        • 13. Sections 110.8, Ground-Fault Circuit-Interrupter (GFCI) Protection. 110.9?Overcurrent Protection Modification. 110.10?Equipment Use.
  • Electrical Safety (NFPA 70E 2024) Part 2
    • Electrical Safety (NFPA 70E 2024) Part 2 [12 Activities]
      • 01. Article 120, Establishing an Electrically Safe Work Condition
      • 02. Section 120.2, Lockout/Tagout Program.
      • 03. Section 120.3, Lockout/Tagout Principles.
      • 04. Section 120.4, Lockout/Tagout Equipment.
      • 05. Section 120.5?Lockout/Tagout Procedures PART-I.
      • 06. Section 120.5 Lockout/Tagout Procedures PART-II.
      • 07. Section 120.6, Process for Establishing and Verifying an Electrically Safe Work Condition.
      • 08. Article 130: Work Involving Electrical Hazards
      • View Additional Activities
        • 09. Section 130.5, Arc Flash Risk Assessment.
        • 10. Section 130.7(C)(1) through (C)(8),?Personal and Other Protective Equipment.
        • 11. Section 130.7(C)(9) through (C)(15),?Personal and Other Protective Equipment.
        • 12. Section 130.7(C). Personal Protective Equipment (Tables).
  • Pump Installation and Maintenance
    • Pump Installation and Maintenance [52 Activities]
      • 01. Force and Work
      • 02. Power and Horsepower
      • 03. Energy
      • 04. Velocity and Acceleration
      • 05. Static Suction Lift
      • 06. Pressure Losses: Friction and Vapor Pressure
      • 07. Available and Required Net Positive Suction Head (NPSH)
      • 08. Checking Pump Capacity and Pumping Hot Water
      • View Additional Activities
        • 09. Computing Pump Power Requirements and Effects of Operational Factors
        • 10. Priming a Pump
        • 11. Uses and Types of Packing and Seals
        • 12. Packing
        • 13. Selecting Packing Material
        • 14. Removing Old Packing
        • 15. Installing New Packing
        • 16. Testing New Packing and Packing Precautions
        • 17. Mechanical Seals
        • 18. Mechanical Seals Versus Packing
        • 19. Types of Mechanical Seals
        • 20. Installing Mechanical Seals
        • 21. Maintaining and Troubleshooting Packing and Seals
        • 22. Installing the Pump and Preparing the Foundation
        • 23. Fabricated Steel Baseplates
        • 24. Checking Shaft Alignment and Grouting the Baseplate
        • 25. Mounting Pump and Motor Separately
        • 26. Compensating for Heat and Installing Auxiliary Pump Drives
        • 27. Maintaining Centrifugal Pumps
        • 28. Inspecting Packing, Seals, and Bearings
        • 29. Motor and Drive
        • 30. Avoiding Common Pump Problems
        • 31. Cavitation
        • 32. Ring Seizure
        • 33. Overheating
        • 34. Pump Operation
        • 35. Scheduling Maintenance and Troubleshooting
        • 36. Preparation, Work Areas, and Rigging
        • 37. Moving a Pump
        • 38. Disassembling a Pump
        • 39. Inspecting Pump Parts
        • 40. Checking Clearances
        • 41. Reassembling a Pump
        • 42. Reinstalling a Pump
        • 43. Types of Rotary Pumps
        • 44. Gear-Type and Vane-Type Rotary Pumps
        • 45. Axial-Flow Pumps
        • 46. Installing Rotary Pumps
        • 47. Aligning Pump and Piping
        • 48. Direction of Rotation
        • 49. Pump Start-Up
        • 50. Maintaining Rotary Pumps
        • 51. Scheduling Inspections and Maintenance
        • 52. Troubleshooting Rotary Pumps
  • Course Completion
    • Mandatory Questionnaire
    • Valve Maintenance and Piping System Protection - Certificate of Achievement (1 of 8)
    • Pumps: Part 1 - Certificate of Achievement (2 of 8)
    • Pumps: Part 2 - Certificate of Achievement (3 of 8)
    • Wastewater Treatment Processes - Certificate of Achievement (4 of 8)
    • Maintaining Wastewater Equipment - Certificate of Achievement (5 of 8)
    • Electrical Safety (NFPA 70E 2024) Part 1 - Certificate of Achievement (6 of 8)
    • Electrical Safety (NFPA 70E 2024) Part 2 - Certificate of Achievement (7 of 8)
    • Pump Installation and Maintenance - Certificate of Achievement (8 of 8)
    • Guaranteed Next Business Day Reporting
Instructor Image

Instructor Bio

All At Your Pace Online courses are written, reviewed, and developed by internal and external subject matter experts (SMEs) with decades of experience in the water operator industry and related trades.