This 20-Hour package is approved for Oregon Drinking Water Operators. This package includes the following courses:

  • Water Utility Management (5 hours)
  • Pumps Part 1 (3 hours)
  • Pumps Part 2 (3 hours)
  • Piping Systems Part 1 (3 hours)
  • Piping Systems Part 2 (3 hours)
  • Electrical Safety (NFPA 70E 2024) Part 1 (2 hours)
  • Fluid Mechanics (1 hour)

Course Format: Text

Credit Type: Wastewater, Drinking Water, Onsite Install, Onsite O&M, Wastewater, Drinking Water, Drinking Water, Wastewater

CEUs: 2

Course ID(s): 7562, 7561, 6159, 7558, 7563, 6447, 7565

Approved By: Oregon Environmental Services Advisory Council (OESAC)

20-Hour Package for Oregon Drinking Water Operators

  • Pumps Part 1 [42 Activities]
    • 01. The Development of Pumps
    • 02. Pumping Systems
    • 03. Water Pumping Systems
    • 04. Chemical Pumping Systems
    • 05. Waste Pumping Systems
    • 06. High-Viscosity Material Pumping Systems
    • 07. Solid Pumping Systems
    • 08. Pumping Terminology
    • 09. Calculating Total Head
    • 10. Horsepower Calculations
    • 11. Total Energy vs Available NPSH
    • 12. Available NPSH vs Required NPSH
    • 13. Pump Performance Curves
    • 14. Head Capacity Curves
    • 15. Curve Families
    • 16. Pump Selection
    • 17. Centrifugal Pumps
    • 18. Pump Part Definitions
    • 19. End-Suction Casing Configurations
    • 20. Split-Case Centrifugal Pumps
    • 21. Double-Volume Pumps
    • 22. Impeller Types
    • 23. Wear Rings
    • 24. Shafts, Bearings, and Sleeves
    • 25. Turbine Pumps Overview and Lineshaft Turbines
    • 26. Can Turbines
    • 27. Submersible Turbines
    • 28. Flow Patterns
    • 29. Axial-Flow Propeller Pumps
    • 30. Mixed-Flow Propeller Pumps
    • 31. Special Propeller Pumps and Turbine Pump Construction
    • 32. Vertical Turbine Pump Application
    • 33. Regenerative Turbine Pumps
    • 34. Introduction to Rotary Pumps
    • 35. External-Gear Pumps
    • 36. Internal-Gear Pumps
    • 37. Lobe Pumps
    • 38. Screw Pumps
    • 39. Vane Pumps
    • 40. Rotary Piston Pumps
    • 41. Flexible-Members Pumps
    • 42. Rotary Pump Installations
  • Pumps Part 2 [41 Activities]
    • 01. Reciprocating Pump Applications
    • 02. Reciprocating Pump Parts
    • 03. Reciprocating Pump Classifications
    • 04. Steam-Driven Pump Operation
    • 05. Power Pump Operations
    • 06. Horizontal Plunger Pumps
    • 07. Vertical Plunger Pumps
    • 08. Air-Driven Pump Operations
    • 09. Introduction to Metering Pumps
    • 10. Metering Pump Classification
    • 11. Plunger and Piston Metering Pumps
    • 12. Diaphragm Pumps
    • 13. Air-Operated Metering Pumps
    • 14. Rotary Metering Pumps
    • 15. Handling Difficult Materials
    • 16. Chemical Pumps
    • 17. Special Chemical Pumps
    • 18. Magnetic-Drive Pumps
    • 19. Canned-Motor Pumps
    • 20. Centrifugal Slurry Pumps
    • 21. Pulp-Handling Pumps
    • 22. Trash and Sewage Pumps
    • 23. Diaphragm Pumps
    • 24. Reciprocating Slurry Pumps
    • 25. Vortex Pumps
    • 26. Pump Sealing Requirements
    • 27. Stuffing Boxes
    • 28. Packing Materials
    • 29. Installing Packing
    • 30. Mechanical Seals
    • 31. Special Seals
    • 32. Pump and Sleeve Bearings
    • 33. Antifriction and Special Bearings
    • 34. Bearing Lubrication
    • 35. Bearing Seals
    • 36. Pump Installation and Maintenance
    • 37. End-Suction Centrifugal Pumps
    • 38. Vertical Turbine Pumps
    • 39. Rotary Pumps
    • 40. Reciprocating Pumps
    • 41. Difficult Material Pumps and Other Maintenance Problems
  • Piping Systems Part 1 [45 Activities]
    • 01. Piping Systems
    • 02. Fluids
    • 03. Protecting Steam Lines
    • 04. Keeping Fluids Clean and Moving
    • 05. Piping System Maintenance
    • 06. Valves and Fittings
    • 07. Pipe Hangers and Supports
    • 08. Temperature Effects
    • 09. Piping Insulation
    • 10. Typical Piping Systems
    • 11. Maintenance Considerations
    • 12. Pipes
    • 13. Pipe Schedules and Other Pipe Codes
    • 14. Types of Systems
    • 15. Metal Piping and Characteristics of Metals
    • 16. Pipe-Manufacturing Methods
    • 17. Behavior of Fluids in Piping
    • 18. Piping Applications
    • 19. Maintenance Considerations
    • 20. Joining Pipe
    • 21. Nonmetallic Piping Materials
    • 22. Concrete Pipe
    • 23. Asbestos-Cement Pipe
    • 24. Plastic Pipe
    • 25. Limitations of Plastic Pipe
    • 26. Joining Plastic Pipe
    • 27. Maintaining Plastic Pipe
    • 28. Glass Pipe
    • 29. Maintenance Requirements
    • 30. Tubing
    • 31. Advantages of Tubing
    • 32. Tube Joining
    • 33. Types of Tubing
    • 34. Tubing Applications
    • 35. Plastic Tubing
    • 36. Other Applications and Maintenance
    • 37. Hoses
    • 38. Codes and Sizes
    • 39. Hose Classifications
    • 40. Hose Terminology
    • 41. Reinforced Nonmetallic Hose
    • 42. Nonmetallic Hose
    • 43. Metallic Hose
    • 44. Hose Couplings
    • 45. Maintenance
  • Piping Systems Part 2 [49 Activities]
    • 01. Fittings
    • 02. Functions of Fittings
    • 03. Screwed and Flanged Connections
    • 04. Other Fittings
    • 05. Welded Connections
    • 06. Tube Fittings
    • 07. Drawing Symbols
    • 08. Valves
    • 09. Types of Industrial Valves
    • 10. Gate Valves
    • 11. Globe Valves
    • 12. Needle Valves
    • 13. Ball Valves
    • 14. Butterfly Valves
    • 15. Plug Valves
    • 16. Check Valves
    • 17. Quick-Opening Valves
    • 18. Valve Maintenance and Connections
    • 19. Specialized Valves and Diaphragm Valves
    • 20. Blowdown Valves
    • 21. Pressure-Regulating Valves
    • 22. Temperature-Regulating Valves
    • 23. Safety Valves
    • 24. Relief Valves
    • 25. Rupture-Disk Relief Valves
    • 26. Reducing Valves
    • 27. Other Valves
    • 28. Valve Operators
    • 29. Magnetic, Pneumatic, and Hydraulic Operators
    • 30. Remote Control
    • 31. General Applications
    • 32. Strainers
    • 33. Filters
    • 34. Steam
    • 35. Traps
    • 36. Vent Valves
    • 37. Trap Maintenance
    • 38. Typical Piping System
    • 39. Pressure Gauges
    • 40. Temperature Gauges
    • 41. Rotary Pressure Joints
    • 42. Vacuum Breakers
    • 43. Accumulators
    • 44. Receivers
    • 45. Actuators and Intensifiers
    • 46. Pneumatic Pressure Line Accessories
    • 47. Heat Exchangers
    • 48. Wrenches
    • 49. Maintenance
  • Electrical Safety (NFPA 70E 2024) [13 Activities]
    • 01. Article 90: Sections 90.1, 90.2, 90.3
    • 02. Article 90: Sections 90.4, 90.5, 90.6
    • 03. Article 100 Definitions
    • 04. Article 105, Application of Safety-Related Work Practices and Procedures
    • 05. Article 110, General Requirements for Electrical Safety-Related Work Practices
    • 06. Section 110.3, Electrical Safety Program.
    • 07. Section 110.4, Training Requirements.
    • 08. Section 110.5 Host and Contract Employers Responsibilities.
    • 09. Section 110.6, Test Instruments and Equipment.
    • 10. Section 110.7(A)&(B), Portable Cord- and-Plug-Connected Electric Equipment.
    • 11. Section 110.7(C)-(F), Portable Cord- and-Plug-Connected Electric Equipment.
    • 12. Section 110.8, Ground-Fault Circuit-Interrupter (GFCI) Protection.
    • 13. Sections 110.8, Ground-Fault Circuit-Interrupter (GFCI) Protection. 110.9 Overcurrent Protection Modification. 110.10 Equipment Use.
  • Fluid Mechanics [11 Activities]
    • 01. Definition of a Fluid
    • 02. Fluids Distribute Forces
    • 03. Definition of Pressure
    • 04. Measuring Pressure
    • 05. Sources of Fluid Pressure
    • 06. Gauge Verses Absolute Pressure
    • 07. Liquid Seeks Its Own Level
    • 08. Velocity Head Verses Static Pressure
    • 09. The Bernoulli Effect and Venturi Applications
    • 10. Friction Head
    • 11. The Siphon
  • Water Utility Management
    • Module One. Successful Water Utilities Management: Theories and Planning
      • Introduction to Water Utility Management [1 Activities]
        • 01. Module One. Successful Water Utilities Management: Theories and Planning
        • Quiz #1 (3 questions)
      • Characteristics of Successful Water Utility Management [1 Activities]
        • 01. Characteristics of Successful Water Utility Management
        • Quiz #2 (3 questions)
      • Management Theories [1 Activities]
        • 01. Management Theories
        • Quiz #3 (3 questions)
      • Problems Associated with Management: Overview [1 Activities]
        • 01. Problems Associated with Management, Overview
        • Quiz #4 (1 questions)
      • Problems Associated with Management: Planning [1 Activities]
        • 01. Planning
        • Quiz #5 (2 questions)
      • Problems Associated with Management: Risk Assessment [1 Activities]
        • 01. Risk Assessment
        • Quiz #6 (2 questions)
      • Risk Management [1 Activities]
        • 01. Risk Management
        • Quiz #7 (4 questions)
      • Best Practices for Water Utility Management: Overview [1 Activities]
        • 01. Best Practices, Overview
        • Quiz #8 (1 questions)
      • Best Practices for Water Utility Management: Self-Assessment [1 Activities]
        • 01. Best Practices for Water Utility Management: Self-Assessment
        • Quiz #9 (2 questions)
      • Best Practices for Water Utility Management: Organizational Culture [1 Activities]
        • 01. Best Practices for Water Utility Management: Organizational Culture
        • Quiz #10 (1 questions)
    • Module Two. Practical Approaches to Utility Management
      • Overview (Practical Approaches to Utility Management) [1 Activities]
        • 01. Module Two. Practical Approaches to Utility Management
        • Quiz #11 (1 questions)
      • Lean Techniques [1 Activities]
        • 01. Lean Techniques
        • Quiz #12 (2 questions)
      • Additional Resources and Tools: Overview [1 Activities]
        • 01. Additional Resources, Overview
        • Quiz #13 (1 questions)
      • Additional Resources and Tools: Effective Utilities Management (EUM) [1 Activities]
        • 01. Additional Resources and Tools: Effective Utilities Management (EUM)
        • Quiz #14 (2 questions)
      • Additional Resources and Tools: Case Studies [1 Activities]
        • 01. Additional Resources and Tools: Case Studies
        • Quiz #15 (2 questions)
      • Continual Improvement Management [1 Activities]
        • 01. Continual Improvement Management
        • Quiz #16 (2 questions)
      • Reliability [1 Activities]
        • 01. Reliability
        • Quiz #17 (2 questions)
    • Module Three. Workplace Safety: Requirements and Resources
      • Overview of Workplace Safety [1 Activities]
        • 01. Module Three. Workplace Safety
        • Quiz #18 (2 questions)
      • Hazardous Materials and Environmental Risks [1 Activities]
        • 01. Hazardous Materials and Environmental Risks
        • Quiz #19 (2 questions)
      • Workplace Hazards [1 Activities]
        • 01. Workplace Hazards
        • Quiz #20 (2 questions)
      • Safety Recommendations [1 Activities]
        • 01. Safety Recommendations
        • Quiz #21 (3 questions)
      • Safety Requirements [1 Activities]
        • 01. Safety Requirements
        • Quiz #22 (3 questions)
      • Safety Resources [1 Activities]
        • 01. Safety Resources
        • Quiz #23 (2 questions)
      • Conclusion [1 Activities]
        • 01. Conclusion
        • Quiz #24 (2 questions)

Course Completion

  • Mandatory Questionnaire
  • Pumps: Part 1 - Certificate of Achievement
  • Pumps: Part 2 - Certificate of Achievement
  • Piping Systems: Part 1 - Certificate of Achievement
  • Piping Systems: Part 2 - Certificate of Achievement
  • Electrical Safety (NFPA 70E 2024) Part 1 - Certificate of Achievement
  • Fluid Mechanics - Certificate of Achievement
  • Water Utility Management - Certificate of Achievement
  • Guaranteed Next Business Day Reporting