This 8-hour package is approved in Ohio for Class A Water Operators. This package includes the following approved courses:

  • Electrical Safety (NFPA 70E 2024) Part 1 - 4 hours
  • Pipelines - 2 hours
  • Storage Tanks - 2 hours

Course Format: Text

Credit Type: All Operators

Course ID(s): OEPA-B88956546-X, OEPA-B881075915-OM, OEPA-B881075917-OM

Approved By: Environmental Protection Agency - Operator Certification

8-Hour Package for Class A Water Operators

  • Electrical Safety (NFPA 70E 2024) Part1 [25 Activities]
    • 01. Article 90: Sections 90.1, 90.2, 90.3
    • 02. Article 90: Sections 90.4, 90.5, 90.6
    • 03. Article 100 Definitions
    • 04. Article 105, Application of Safety-Related Work Practices and Procedures
    • 05. Article 110, General Requirements for Electrical Safety-Related Work Practices
    • 06. Section 110.3, Electrical Safety Program.
    • 07. Section 110.4, Training Requirements.
    • 08. Section 110.5, Host and Contract Employers' Responsibilities.
    • 09. Section 110.6, Test Instruments and Equipment.
    • 10. Section 110.7(A)&(B), Portable Cord- and-Plug-Connected Electric Equipment.
    • 11. Section 110.7(C)-(F), Portable Cord- and-Plug-Connected Electric Equipment.
    • 12. Section 110.8, Ground-Fault Circuit-Interrupter (GFCI) Protection.
    • 13. Sections 110.8, Ground-Fault Circuit-Interrupter (GFCI) Protection. 110.9 Overcurrent Protection Modification. 110.10 Equipment Use.
    • 14. Article 120, Establishing an Electrically Safe Work Condition
    • 15. Section 120.2, Lockout/Tagout Program.
    • 16. Section 120.3, Lockout/Tagout Principles.
    • 17. Section 120.4, Lockout/Tagout Equipment.
    • 18. Section 120.5 Lockout/Tagout Procedures PART-I.
    • 19. Section 120.5 Lockout/Tagout Procedures PART-II.
    • 20. Section 120.6, Process for Establishing and Verifying an Electrically Safe Work Condition.
    • 21. Article 130: Work Involving Electrical Hazards
    • 22. Section 130.5, Arc Flash Risk Assessment.
    • 23. Section 130.7(C)(1) through (C)(8), Personal and Other Protective Equipment.
    • 24. Section 130.7(C)(9) through (C)(15), Personal and Other Protective Equipment.
    • 25. Section 130.7(C). Personal Protective Equipment (Tables).
  • Pipelines [12 Activities]
    • 01. Introduction
    • 02. Pipeline Composition
    • 03. Installation
    • 04. Joining
    • 05. General Operations
    • 06. General Regulations, Overview
    • 07. Pressure
    • 08. Monitoring and Management
    • 09. Maintenance
    • 10. Safety
    • 11. Environmental Concerns
    • 12. Conclusion
  • Storage Tanks [14 Activities]
    • 01. An Introduction to Storage Tanks and Their Facilities
    • 02. Common Types and Classification
    • 03. Sizes and Common Materials
    • 04. Storage Tank Components
    • 05. Basic Operation
    • 06. Water Demand
    • 07. Regulations and Standards
    • 08. Regulations and Standards: Facility and Tank Construction
    • 09. General Maintenance
    • 10. Disinfection and Sanitation
    • 11. Safety
    • 12. Security
    • 13. Inspections
    • 14. Conclusion

Course Completion

  • Mandatory Questionnaire
  • Electrical Safety (NFPA 70E 2024) Part 1 - Certificate of Achievement
  • Pipelines - Certificate of Achievement
  • Storage Tanks - Certificate of Achievement
  • Guaranteed Next-Day Reporting