This package includes 40-hours of approved courses and is intended Louisiana water operators that hold multiple certifications. The following courses are included:

  • Electrical Safety (NFPA 70E 2024) - 8 hours
  • Introduction to Water Technology - 5 hours
  • Pumps Part 1 - 5 hours
  • Pumps Part 2 - 5 hours
  • Piping Systems Part 1 - 5 hours
  • Piping Systems Part 2 - 5 hours
  • Wastewater Treatment Processes - 5 hours
  • Pipelines - 2 hours

Course Format: Text

Credit Type: Water, Wastewater, Wastewater

Course ID(s): 68992, 68997, 69000, 68998, 69003, 68999, 68990, 68995

Approved By: Department of Health And Hospitals - Center For Environmental Health

40-Hour Package for Water Operators

  • Electrical Safety (NFPA 70E 2024)
    • Electrical Safety (NFPA 70E 2024) Part 1 [25 Activities]
      • 01. Article 90: Sections 90.1, 90.2, 90.3
      • 02. Article 90: Sections 90.4, 90.5, 90.6
      • 03. Article 100 Definitions
      • 04. Article 105, Application of Safety-Related Work Practices and Procedures
      • 05. Article 110, General Requirements for Electrical Safety-Related Work Practices
      • 06. Section 110.3, Electrical Safety Program.
      • 07. Section 110.4, Training Requirements.
      • 08. Section 110.5 Host and Contract Employers’ Responsibilities.
      • 09. Section 110.6, Test Instruments and Equipment.
      • 10. Section 110.7(A)&(B), ?Portable Cord- and-Plug-Connected Electric Equipment.
      • 11. Section 110.7(C)-(F), ?Portable Cord- and-Plug-Connected Electric Equipment.
      • 12. Section 110.8, ?Ground-Fault Circuit-Interrupter (GFCI) Protection.
      • 13. Sections 110.8, Ground-Fault Circuit-Interrupter (GFCI) Protection. 110.9?Overcurrent Protection Modification. 110.10?Equipment Use.
      • 14. Article 120, Establishing an Electrically Safe Work Condition
      • 15. Section 120.2, Lockout/Tagout Program.
      • 16. Section 120.3, Lockout/Tagout Principles.
      • 17. Section 120.4, Lockout/Tagout Equipment.
      • 18. Section 120.5?Lockout/Tagout Procedures PART-I.
      • 19. Section 120.5 Lockout/Tagout Procedures PART-II.
      • 20. Section 120.6, Process for Establishing and Verifying an Electrically Safe Work Condition.
      • 21. Article 130: Work Involving Electrical Hazards
      • 22. Section 130.5, Arc Flash Risk Assessment.
      • 23. Section 130.7(C)(1) through (C)(8),?Personal and Other Protective Equipment.
      • 24. Section 130.7(C)(9) through (C)(15),?Personal and Other Protective Equipment.
      • 25. Section 130.7(C). Personal Protective Equipment (Tables).
    • Electrical Safety (NFPA 70E 2024) Part 2 [25 Activities]
      • 01. Section 130.7(D). Other Protective Equipment.
      • 02. Section 130.8(A)-(D). Other Precautions for Personnel Activities.
      • 03. Section 130.8(E)–(N). Other Precautions for Personnel Activities.
      • 04. Section 130.8(O). Alerting Techniques.
      • 05. Section 130.9, Work Within the Limited Approach Boundary or Arc Flash Boundary of Overhead Lines
      • 06. CHAPTER 2, SAFETY-RELATED MAINTENANCE REQUIREMENTS.
      • 07. Article 205, General (Requirements)
      • 08. Article 210, Substations, Switchgear Assemblies, Switchboards, Panelboards, Motor Control Centers, and Disconnect Switches
      • 09. Article 215, Premises Wiring
      • 10. Article 220, Controller Equipment
      • 11. Article 225, Fuses and Circuit Breakers
      • 12. Article 230, Rotating Equipment
      • 13. Article 235, Hazardous (Classified) Locations
      • 14. Article 240: Batteries and Battery Rooms
      • 15. Article 245, Portable Electric Tools and Equipment
      • 16. Article 250, Personal Safety and Protective Equipment
      • 17. CHAPTER 3, SAFETY REQUIREMENTS FOR SPECIAL EQUIPMENT.
      • 18. Article 310, Safety-Related Work Practices for Electrolytic Cells.
      • 19. Article 320, Safety Requirements Related to Batteries and Battery Rooms.
      • 20. Article 330, Safety-Related Work Practices: Lasers
      • 21. Article 340, Safety-Related Work Practices: Power Electronic Equipment.
      • 22. Article 350, Safety-Related Work Requirements: Research and Development Laboratories
      • 23. Article 360, Safety-Related Requirements for Capacitors.
      • 24. Informative Annex A, Informative Publications.
      • 25. Informative Annex J, Energized Electrical Work Permit.
  • Introduction to Water Technology [51 Activities]
    • 01. The Water Cycle
    • 02. Precipitation
    • 03. Surface Runoff
    • 04. Groundwater
    • 05. Lots of Water, but…
    • 06. Water Use
    • 07. Industrial Use
    • 08. Agricultural Use and Waste
    • 09. Beginning of Waterworks
    • 10. Centuries of Neglect
    • 11. Water Treatment - Beginning to Today
    • 12. Collecting Surface and Ground Water
    • 13. Transmission of Water
    • 14. Why Treat the Supply Water?
    • 15. Types of Treatment
    • 16. Treatment in the Treatment Plant and Distribution
    • 17. Collecting Wastewater
    • 18. Treating Wastewater
    • 19. Primary Treatment
    • 20. Secondary Treatment
    • 21. Tertiary Treatment
    • 22. Basic Properties of Water
    • 23. The Color of Water
    • 24. Measuring Water Color
    • 25. Taste and Odor of Water
    • 26. The Temperature of Water
    • 27. Solids in Water
    • 28. Total Solids in Water
    • 29. Volatile and Fixed Solids
    • 30. Turbidity and Suspended Matter
    • 31. Electrical Conductivity
    • 32. Atoms and Molecules
    • 33. Acids, Bases, and Salts
    • 34. The Ionization of Water
    • 35. Alkalinity
    • 36. Acidity
    • 37. Hardness of Water
    • 38. Other Unwanted Chemicals
    • 39. Dissolved Oxygen
    • 40. Pathogenicity
    • 41. Disinfection
    • 42. Stabilization of Organic Matter
    • 43. Biochemical Oxygen Demand
    • 44. Factors Affecting Growth
    • 45. The Food Chain and Living Things
    • 46. Bacteria
    • 47. Environmental Classifications of Bacteria
    • 48. Bacteria in Treatment Plants
    • 49. Viruses
    • 50. Algae
    • 51. Protozoa and Higher Organisms
  • Pumps Part 1 [42 Activities]
    • 01. The Development of Pumps
    • 02. Pumping Systems
    • 03. Water Pumping Systems
    • 04. Chemical Pumping Systems
    • 05. Waste Pumping Systems
    • 06. High-Viscosity Material Pumping Systems
    • 07. Solid Pumping Systems
    • 08. Pumping Terminology
    • 09. Calculating Total Head
    • 10. Horsepower Calculations
    • 11. Total Energy vs Available NPSH
    • 12. Available NPSH vs Required NPSH
    • 13. Pump Performance Curves
    • 14. Head Capacity Curves
    • 15. Curve Families
    • 16. Pump Selection
    • 17. Centrifugal Pumps
    • 18. Pump Part Definitions
    • 19. End-Suction Casing Configurations
    • 20. Split-Case Centrifugal Pumps
    • 21. Double-Volume Pumps
    • 22. Impeller Types
    • 23. Wear Rings
    • 24. Shafts, Bearings, and Sleeves
    • 25. Turbine Pumps Overview and Lineshaft Turbines
    • 26. Can Turbines
    • 27. Submersible Turbines
    • 28. Flow Patterns
    • 29. Axial-Flow Propeller Pumps
    • 30. Mixed-Flow Propeller Pumps
    • 31. Special Propeller Pumps and Turbine Pump Construction
    • 32. Vertical Turbine Pump Application
    • 33. Regenerative Turbine Pumps
    • 34. Introduction to Rotary Pumps
    • 35. External-Gear Pumps
    • 36. Internal-Gear Pumps
    • 37. Lobe Pumps
    • 38. Screw Pumps
    • 39. Vane Pumps
    • 40. Rotary Piston Pumps
    • 41. Flexible-Members Pumps
    • 42. Rotary Pump Installations
  • Pumps Part 2 [41 Activities]
    • 01. Reciprocating Pump Applications
    • 02. Reciprocating Pump Parts
    • 03. Reciprocating Pump Classifications
    • 04. Steam-Driven Pump Operation
    • 05. Power Pump Operations
    • 06. Horizontal Plunger Pumps
    • 07. Vertical Plunger Pumps
    • 08. Air-Driven Pump Operations
    • 09. Introduction to Metering Pumps
    • 10. Metering Pump Classification
    • 11. Plunger and Piston Metering Pumps
    • 12. Diaphragm Pumps
    • 13. Air-Operated Metering Pumps
    • 14. Rotary Metering Pumps
    • 15. Handling Difficult Materials
    • 16. Chemical Pumps
    • 17. Special Chemical Pumps
    • 18. Magnetic-Drive Pumps
    • 19. Canned-Motor Pumps
    • 20. Centrifugal Slurry Pumps
    • 21. Pulp-Handling Pumps
    • 22. Trash and Sewage Pumps
    • 23. Diaphragm Pumps
    • 24. Reciprocating Slurry Pumps
    • 25. Vortex Pumps
    • 26. Pump Sealing Requirements
    • 27. Stuffing Boxes
    • 28. Packing Materials
    • 29. Installing Packing
    • 30. Mechanical Seals
    • 31. Special Seals
    • 32. Pump and Sleeve Bearings
    • 33. Antifriction and Special Bearings
    • 34. Bearing Lubrication
    • 35. Bearing Seals
    • 36. Pump Installation and Maintenance
    • 37. End-Suction Centrifugal Pumps
    • 38. Vertical Turbine Pumps
    • 39. Rotary Pumps
    • 40. Reciprocating Pumps
    • 41. Difficult Material Pumps and Other Maintenance Problems
  • Piping Systems Part 1 [45 Activities]
    • 01. Piping Systems
    • 02. Fluids
    • 03. Protecting Steam Lines
    • 04. Keeping Fluids Clean and Moving
    • 05. Piping System Maintenance
    • 06. Valves and Fittings
    • 07. Pipe Hangers and Supports
    • 08. Temperature Effects
    • 09. Piping Insulation
    • 10. Typical Piping Systems
    • 11. Maintenance Considerations
    • 12. Pipes
    • 13. Pipe Schedules and Other Pipe Codes
    • 14. Types of Systems
    • 15. Metal Piping and Characteristics of Metals
    • 16. Pipe-Manufacturing Methods
    • 17. Behavior of Fluids in Piping
    • 18. Piping Applications
    • 19. Maintenance Considerations
    • 20. Joining Pipe
    • 21. Nonmetallic Piping Materials
    • 22. Concrete Pipe
    • 23. Asbestos-Cement Pipe
    • 24. Plastic Pipe
    • 25. Limitations of Plastic Pipe
    • 26. Joining Plastic Pipe
    • 27. Maintaining Plastic Pipe
    • 28. Glass Pipe
    • 29. Maintenance Requirements
    • 30. Tubing
    • 31. Advantages of Tubing
    • 32. Tube Joining
    • 33. Types of Tubing
    • 34. Tubing Applications
    • 35. Plastic Tubing
    • 36. Other Applications and Maintenance
    • 37. Hoses
    • 38. Codes and Sizes
    • 39. Hose Classifications
    • 40. Hose Terminology
    • 41. Reinforced Nonmetallic Hose
    • 42. Nonmetallic Hose
    • 43. Metallic Hose
    • 44. Hose Couplings
    • 45. Maintenance
  • Piping Systems Part 2 [49 Activities]
    • 01. Fittings
    • 02. Functions of Fittings
    • 03. Screwed and Flanged Connections
    • 04. Other Fittings
    • 05. Welded Connections
    • 06. Tube Fittings
    • 07. Drawing Symbols
    • 08. Valves
    • 09. Types of Industrial Valves
    • 10. Gate Valves
    • 11. Globe Valves
    • 12. Needle Valves
    • 13. Ball Valves
    • 14. Butterfly Valves
    • 15. Plug Valves
    • 16. Check Valves
    • 17. Quick-Opening Valves
    • 18. Valve Maintenance and Connections
    • 19. Specialized Valves and Diaphragm Valves
    • 20. Blowdown Valves
    • 21. Pressure-Regulating Valves
    • 22. Temperature-Regulating Valves
    • 23. Safety Valves
    • 24. Relief Valves
    • 25. Rupture-Disk Relief Valves
    • 26. Reducing Valves
    • 27. Other Valves
    • 28. Valve Operators
    • 29. Magnetic, Pneumatic, and Hydraulic Operators
    • 30. Remote Control
    • 31. General Applications
    • 32. Strainers
    • 33. Filters
    • 34. Steam
    • 35. Traps
    • 36. Vent Valves
    • 37. Trap Maintenance
    • 38. Typical Piping System
    • 39. Pressure Gauges
    • 40. Temperature Gauges
    • 41. Rotary Pressure Joints
    • 42. Vacuum Breakers
    • 43. Accumulators
    • 44. Receivers
    • 45. Actuators and Intensifiers
    • 46. Pneumatic Pressure Line Accessories
    • 47. Heat Exchangers
    • 48. Wrenches
    • 49. Maintenance
  • Wastewater Treatment Processes [46 Activities]
    • 01. Purpose of Treatment
    • 02. Sources of Wastewater
    • 03. Wastewater Collection Systems
    • 04. Typical Treatment Facilities
    • 05. Influent
    • 06. Preliminary Treatment
    • 07. Primary Treatment
    • 08. Secondary Treatment
    • 09. Tertiary Treatment
    • 10. Disinfection and Effluent Discharge
    • 11. Solids Handling
    • 12. Screening
    • 13. Grinding
    • 14. Grit Removal
    • 15. Sedimentation
    • 16. Factors Affecting Settling Rates
    • 17. Types of Clarifiers
    • 18. Air Flotation
    • 19. Filtration and Effluent Disposal
    • 20. Solids in Wastewater
    • 21. Chemical Coagulants
    • 22. Phosphorus Removal
    • 23. Chemical Clarification Equipment
    • 24. Disinfection
    • 25. Factors Affecting Disinfection
    • 26. Disinfection with Chlorine
    • 27. Equipment Used in Chlorine Feeding
    • 28. Lagoons
    • 29. Activated Sludge
    • 30. Aeration with Pure Oxygen
    • 31. Trickling Filters
    • 32. Distribution Systems
    • 33. Trickling Filter Operations
    • 34. Synthetic Media
    • 35. Activated Biofilter Processes (ABF)
    • 36. Rotating Biological Contactors (RBC)
    • 37. Secondary Clarifiers
    • 38. Three Processes
    • 39. Sludge Conditioning
    • 40. Thickening and Dewatering
    • 41. Drying Beds
    • 42. Lagoons
    • 43. Vacuum Filtration and Filter Presses
    • 44. Further Reduction of Water Content
    • 45. Composting
    • 46. Ultimate Disposal
  • Pipelines [10 Activities]
    • 01. Introduction video
    • 02. Pipelines Introduction video
    • 03. Pipeline Operations
    • 04. Pipeline Installation video
    • 05. Pipeline Installation continued
    • 06. Pipeline Joining video
    • 07. Pipeline Considerations
    • 08. Pipeline Maintenance video
    • 09. Pipeline Maintenance Techniques
    • 10. Conclusion Video

Course Completion

  • Mandatory Questionnaire
  • Electrical Safety (NFPA 70E 2024) - Certificate of Achievement
  • Introduction to Water Technology - Certificate of Achievement
  • Pumps Part 1 - Certificate of Achievement
  • Pumps Part 2 - Certificate of Achievement
  • Piping Systems Part 1 - Certificate of Achievement
  • Piping Systems Part 2 - Certificate of Achievement
  • Wastewater Treatment Processes - Certificate of Achievement
  • Pipelines - Certificate of Achievement