This 16-hour package is intended for Louisiana water operators with one or two certifications. The following approved courses are included:

  • Pumps: Part 1
  • Electrical Safety (NFPA 70E 2024)
  • Fluid Mechanics
  • Pumps and Motors
  • Pipelines

Approved By: Division of Unregulated Administration Bureau Commission Office

  • Pumps and Motors
    • Pumps and Motors [6 Activities]
      • 01. Introduction Video
      • 02. Pumps and Motors Introduction video
      • 03. Pumps and Motors Part 1
      • 04. Mechanical components Video
      • 05. Pumps and Motors Part 2
      • 06. Pumps and Motors Conclusion Video
  • Electrical Safety (NFPA 70E 2024)
    • Electrical Safety (NFPA 70E 2024) Part 1 [25 Activities]
      • 01. Article 90: Sections 90.1, 90.2, 90.3
      • 02. Article 90: Sections 90.4, 90.5, 90.6
      • 03. Article 100 Definitions
      • 04. Article 105, Application of Safety-Related Work Practices and Procedures
      • 05. Article 110, General Requirements for Electrical Safety-Related Work Practices
      • 06. Section 110.3, Electrical Safety Program.
      • 07. Section 110.4, Training Requirements.
      • 08. Section 110.5 Host and Contract Employers?? Responsibilities.
      • View Additional Activities
        • 09. Section 110.6, Test Instruments and Equipment.
        • 10. Section 110.7(A)&(B), ?Portable Cord- and-Plug-Connected Electric Equipment.
        • 11. Section 110.7(C)-(F), ?Portable Cord- and-Plug-Connected Electric Equipment.
        • 12. Section 110.8, Ground-Fault Circuit-Interrupter (GFCI) Protection.
        • 13. Sections 110.8, Ground-Fault Circuit-Interrupter (GFCI) Protection. 110.9 Overcurrent Protection Modification. 110.10 Equipment Use.
        • 14. Article 120, Establishing an Electrically Safe Work Condition
        • 15. Section 120.2, Lockout/Tagout Program.
        • 16. Section 120.3, Lockout/Tagout Principles.
        • 17. Section 120.4, Lockout/Tagout Equipment.
        • 18. Section 120.5 Lockout/Tagout Procedures PART-I.
        • 19. Section 120.5 Lockout/Tagout Procedures PART-II.
        • 20. Section 120.6, Process for Establishing and Verifying an Electrically Safe Work Condition.
        • 21. Article 130: Work Involving Electrical Hazards
        • 22. Section 130.5, Arc Flash Risk Assessment.
        • 23. Section 130.7(C)(1) through (C)(8), Personal and Other Protective Equipment.
        • 24. Section 130.7(C)(9) through (C)(15), Personal and Other Protective Equipment.
        • 25. Section 130.7(C). Personal Protective Equipment (Tables).
    • Electrical Safety (NFPA 70E 2024) Part 2 [25 Activities]
      • 01. Section 130.7(D). Other Protective Equipment.
      • 02. Section 130.8(A)-(D). Other Precautions for Personnel Activities.
      • 03. Section 130.8(E) (N). Other Precautions for Personnel Activities.
      • 04. Section 130.8(O). Alerting Techniques.
      • 05. Section 130.9, Work Within the Limited Approach Boundary or Arc Flash Boundary of Overhead Lines
      • 06. CHAPTER 2, SAFETY-RELATED MAINTENANCE REQUIREMENTS.
      • 07. Article 205, General (Requirements)
      • 08. Article 210, Substations, Switchgear Assemblies, Switchboards, Panelboards, Motor Control Centers, and Disconnect Switches
      • View Additional Activities
        • 09. Article 215, Premises Wiring
        • 10. Article 220, Controller Equipment
        • 11. Article 225, Fuses and Circuit Breakers
        • 12. Article 230, Rotating Equipment
        • 13. Article 235, Hazardous (Classified) Locations
        • 14. Article 240: Batteries and Battery Rooms
        • 15. Article 245, Portable Electric Tools and Equipment
        • 16. Article 250, Personal Safety and Protective Equipment
        • 17 CHAPTER 3, SAFETY REQUIREMENTS FOR SPECIAL EQUIPMENT.
        • 18. Article 310, Safety-Related Work Practices for Electrolytic Cells.
        • 19. Article 320, Safety Requirements Related to Batteries and Battery Rooms.
        • 20. Article 330, Safety-Related Work Practices: Lasers
        • 21. Article 340, Safety-Related Work Practices: Power Electronic Equipment.
        • 22. Article 350, Safety-Related Work Requirements: Research and Development Laboratories
        • 23. Article 360, Safety-Related Requirements for Capacitors.
        • 24. Informative Annex A, Informative Publications.
        • 25. Informative Annex J, Energized Electrical Work Permit.
  • Pumps: Part 1
    • Pumps: Part 1 [42 Activities]
      • 01. The Development of Pumps
      • 02. Pumping Systems
      • 03. Water Pumping Systems
      • 04. Chemical Pumping Systems
      • 05. Waste Pumping Systems
      • 06. High-Viscosity Material Pumping Systems
      • 07. Solid Pumping Systems
      • 08. Pumping Terminology
      • View Additional Activities
        • 09. Calculating Total Head
        • 10. Horsepower Calculations
        • 11. Total Energy vs Available NPSH
        • 12. Available NPSH vs Required NPSH
        • 13. Pump Performance Curves
        • 14. Head Capacity Curves
        • 15. Curve Families
        • 16. Pump Selection
        • 17. Centrifugal Pumps
        • 18. Pump Part Definitions
        • 19. End-Suction Casing Configurations
        • 20. Split-Case Centrifugal Pumps
        • 21. Double-Volume Pumps
        • 22. Impeller Types
        • 23. Wear Rings
        • 24. Shafts, Bearings, and Sleeves
        • 25. Turbine Pumps Overview and Lineshaft Turbines
        • 26. Can Turbines
        • 27. Submersible Turbines
        • 28. Flow Patterns
        • 29. Axial-Flow Propeller Pumps
        • 30. Mixed-Flow Propeller Pumps
        • 31. Special Propeller Pumps and Turbine Pump Construction
        • 32. Vertical Turbine Pump Application
        • 33. Regenerative Turbine Pumps
        • 34. Introduction to Rotary Pumps
        • 35. External-Gear Pumps
        • 36. Internal-Gear Pumps
        • 37. Lobe Pumps
        • 38. Screw Pumps
        • 39. Vane Pumps
        • 40. Rotary Piston Pumps
        • 41. Flexible-Members Pumps
        • 42. Rotary Pump Installations
  • Pipelines
    • Pipelines [10 Activities]
      • 01. Introduction video
      • 02. Pipelines Introduction video
      • 03. Pipeline Operations
      • 04. Pipeline Installation video
      • 05. Pipeline Installation continued
      • 06. Pipeline Joining video
      • 07. Pipeline Considerations
      • 08. Pipeline Maintenance video
      • 09. Pipeline Maintenance Techniques
      • 10. Conclusion Video
  • Fluid Mechanics
    • Fluid Mechanics [11 Activities]
      • 01. Definition of a Fluid
      • 02. Fluids Distribute Forces
      • 03. Definition of Pressure
      • 04. Measuring Pressure
      • 05. Sources of Fluid Pressure
      • 06. Gauge Verses Absolute Pressure
      • 07. Liquid Seeks Its Own Level
      • 08. Velocity Head Verses Static Pressure
      • View Additional Activities
        • 09. The Bernoulli Effect and Venturi Applications
        • 10. Friction Head
        • 11. The Siphon
  • Course Completion
    • Mandatory Questionnaire
    • LA Pumps and Motors - Certificate of Achievement (1 of 5)
    • LA Electrical Safety (NFPA 70E 2024) - Certificate of Achievement (2 of 5)
    • LA Pumps: Part 1 - Certificate of Achievement (3 of 5)
    • LA Pipelines - Certificate of Achievement (4 of 5)
    • LA Fluid Mechanics - Certificate of Achievement (5 of 5)
Instructor Image

Instructor Bio

All At Your Pace Online courses are written, reviewed, and developed by internal and external subject matter experts (SMEs) with decades of experience in the water operator industry and related trades.