These individual courses are approved for California drinking water and distribution operators. Save money with our convenient 36-hour package:

  • Pumps: Part 1 (5 hours)
  • Pumps: Part 2 (5 hours)
  • Piping Systems: Part 1 (5 hours)
  • Piping Systems: Part 2 (5 hours)
  • Water Utility Management (5 hours)
  • Valve Maintenance and Piping System Protection (4 hours)
  • Electrical Safety (NFPA 70E 2024) (6 hours)
  • Fluid Mechanics (1 hour)

Course Format: Text

Credit Type: Drinking Water, Distribution Operator, (S/S) Safety, Drinking Water, Drinking Water, Safety, Technical, Distribution Operator

Approved By: Water Board - State Water Resources Control Board

  • Fluid Mechanics
    • Fluid Mechanics [11 Activities]
      • 01. Definition of a Fluid
      • 02. Fluids Distribute Forces
      • 03. Definition of Pressure
      • 04. Measuring Pressure
      • 05. Sources of Fluid Pressure
      • 06. Gauge Verses Absolute Pressure
      • 07. Liquid Seeks Its Own Level
      • 08. Velocity Head Verses Static Pressure
      • View Additional Activities
        • 09. The Bernoulli Effect and Venturi Applications
        • 10. Friction Head
        • 11. The Siphon
  • Valve Maintenance and Piping System Protection
    • Valve Maintenance and Piping System Protection [53 Activities]
      • 01. Valve Materials
      • 02. Threaded Connections
      • 03. Welded and Brazed Connections
      • 04. Flanged Connections
      • 05. Valve Installation
      • 06. Repairing Gate Valves
      • 07. Repairing Globe and Angle Valves
      • 08. Repairing Ball Valves
      • View Additional Activities
        • 09. Maintaining Plug Valves
        • 10. Maintaining Check Valves
        • 11. General Maintenance
        • 12. Special Valves
        • 13. Butterfly Valves
        • 14. Diaphragm Valves
        • 15. Pop Safety Valves
        • 16. Relief Valves
        • 17. Safety Relief Valves
        • 18. Pressure-Reducing and Regulating Valves
        • 19. Quick-Opening Valves
        • 20. Valve Actuators
        • 21. Diaphragm Actuators
        • 22. Piston Actuators
        • 23. Electric Actuators
        • 24. Actuator Installation
        • 25. Actuator Maintenance and Repair
        • 26. Bourdon Tube
        • 27. Bimetallic Gauge
        • 28. Bellows Gauge
        • 29. Flowmeters
        • 30. Rotating Unions
        • 31. Accumulators
        • 32. Air Receivers
        • 33. Application Considerations and Studying the Total System
        • 34. Valve Applications
        • 35. Valve Materials
        • 36. Valve Identification
        • 37. Soldered Valve Connections
        • 38. Threaded Valve Connections
        • 39. Flanged Valve Connections
        • 40. Tool Selection
        • 41. Valve Location
        • 42. Positioning the Valve
        • 43. Protecting Hot Pipelines
        • 44. Heat Conduction, Convection, and Radiation
        • 45. Installing and Maintaining Insulation
        • 46. Tracing
        • 47. Installing Steam Tracers
        • 48. Electric Tracing, Tracing Valves, and Fittings
        • 49. Protection From Freezing
        • 50. Protection From Corrosives
        • 51. Active and Passive Protection
        • 52. Inspection of Piping Protection
        • 53. Hangers and Supports
  • Piping Systems: Part 1
    • Piping Systems: Part 1 [45 Activities]
      • 01. Piping Systems
      • 02. Fluids
      • 03. Protecting Steam Lines
      • 04. Keeping Fluids Clean and Moving
      • 05. Piping System Maintenance
      • 06. Valves and Fittings
      • 07. Pipe Hangers and Supports
      • 08. Temperature Effects
      • View Additional Activities
        • 09. Piping Insulation
        • 10. Typical Piping Systems
        • 11. Maintenance Considerations
        • 12. Pipes
        • 13. Pipe Schedules and Other Pipe Codes
        • 14. Types of Systems
        • 15. Metal Piping and Characteristics of Metals
        • 16. Pipe-Manufacturing Methods
        • 17. Behavior of Fluids in Piping
        • 18. Piping Applications
        • 19. Maintenance Considerations
        • 20. Joining Pipe
        • 21. Nonmetallic Piping Materials
        • 22. Concrete Pipe
        • 23. Asbestos-Cement Pipe
        • 24. Plastic Pipe
        • 25. Limitations of Plastic Pipe
        • 26. Joining Plastic Pipe
        • 27. Maintaining Plastic Pipe
        • 28. Glass Pipe
        • 29. Maintenance Requirements
        • 30. Tubing
        • 31. Advantages of Tubing
        • 32. Tube Joining
        • 33. Types of Tubing
        • 34. Tubing Applications
        • 35. Plastic Tubing
        • 36. Other Applications and Maintenance
        • 37. Hoses
        • 38. Codes and Sizes
        • 39. Hose Classifications
        • 40. Hose Terminology
        • 41. Reinforced Nonmetallic Hose
        • 42. Nonmetallic Hose
        • 43. Metallic Hose
        • 44. Hose Couplings
        • 45. Maintenance
  • Piping Systems: Part 2
    • Piping Systems: Part 2 [49 Activities]
      • 01. Fittings
      • 02. Functions of Fittings
      • 03. Screwed and Flanged Connections
      • 04. Other Fittings
      • 05. Welded Connections
      • 06. Tube Fittings
      • 07. Drawing Symbols
      • 08. Valves
      • View Additional Activities
        • 09. Types of Industrial Valves
        • 10. Gate Valves
        • 11. Globe Valves
        • 12. Needle Valves
        • 13. Ball Valves
        • 14. Butterfly Valves
        • 15. Plug Valves
        • 16. Check Valves
        • 17. Quick-Opening Valves
        • 18. Valve Maintenance and Connections
        • 19. Specialized Valves and Diaphragm Valves
        • 20. Blowdown Valves
        • 21. Pressure-Regulating Valves
        • 22. Temperature-Regulating Valves
        • 23. Safety Valves
        • 24. Relief Valves
        • 25. Rupture-Disk Relief Valves
        • 26. Reducing Valves
        • 27. Other Valves
        • 28. Valve Operators
        • 29. Magnetic, Pneumatic, and Hydraulic Operators
        • 30. Remote Control
        • 31. General Applications
        • 32. Strainers
        • 33. Filters
        • 34. Steam
        • 35. Traps
        • 36. Vent Valves
        • 37. Trap Maintenance
        • 38. Typical Piping System
        • 39. Pressure Gauges
        • 40. Temperature Gauges
        • 41. Rotary Pressure Joints
        • 42. Vacuum Breakers
        • 43. Accumulators
        • 44. Receivers
        • 45. Actuators and Intensifiers
        • 46. Pneumatic Pressure Line Accessories
        • 47. Heat Exchangers
        • 48. Wrenches
        • 49. Maintenance
  • Pumps: Part 1
    • Pumps: Part 1 [42 Activities]
      • 01. The Development of Pumps
      • 02. Pumping Systems
      • 03. Water Pumping Systems
      • 04. Chemical Pumping Systems
      • 05. Waste Pumping Systems
      • 06. High-Viscosity Material Pumping Systems
      • 07. Solid Pumping Systems
      • 08. Pumping Terminology
      • View Additional Activities
        • 09. Calculating Total Head
        • 10. Horsepower Calculations
        • 11. Total Energy vs Available NPSH
        • 12. Available NPSH vs Required NPSH
        • 13. Pump Performance Curves
        • 14. Head Capacity Curves
        • 15. Curve Families
        • 16. Pump Selection
        • 17. Centrifugal Pumps
        • 18. Pump Part Definitions
        • 19. End-Suction Casing Configurations
        • 20. Split-Case Centrifugal Pumps
        • 21. Double-Volume Pumps
        • 22. Impeller Types
        • 23. Wear Rings
        • 24. Shafts, Bearings, and Sleeves
        • 25. Turbine Pumps Overview and Lineshaft Turbines
        • 26. Can Turbines
        • 27. Submersible Turbines
        • 28. Flow Patterns
        • 29. Axial-Flow Propeller Pumps
        • 30. Mixed-Flow Propeller Pumps
        • 31. Special Propeller Pumps and Turbine Pump Construction
        • 32. Vertical Turbine Pump Application
        • 33. Regenerative Turbine Pumps
        • 34. Introduction to Rotary Pumps
        • 35. External-Gear Pumps
        • 36. Internal-Gear Pumps
        • 37. Lobe Pumps
        • 38. Screw Pumps
        • 39. Vane Pumps
        • 40. Rotary Piston Pumps
        • 41. Flexible-Members Pumps
        • 42. Rotary Pump Installations
  • Pumps: Part 2
    • Pumps: Part 2 [41 Activities]
      • 01. Reciprocating Pump Applications
      • 02. Reciprocating Pump Parts
      • 03. Reciprocating Pump Classifications
      • 04. Steam-Driven Pump Operation
      • 05. Power Pump Operations
      • 06. Horizontal Plunger Pumps
      • 07. Vertical Plunger Pumps
      • 08. Air-Driven Pump Operations
      • View Additional Activities
        • 09. Introduction to Metering Pumps
        • 10. Metering Pump Classification
        • 11. Plunger and Piston Metering Pumps
        • 12. Diaphragm Pumps
        • 13. Air-Operated Metering Pumps
        • 14. Rotary Metering Pumps
        • 15. Handling Difficult Materials
        • 16. Chemical Pumps
        • 17. Special Chemical Pumps
        • 18. Magnetic-Drive Pumps
        • 19. Canned-Motor Pumps
        • 20. Centrifugal Slurry Pumps
        • 21. Pulp-Handling Pumps
        • 22. Trash and Sewage Pumps
        • 23. Diaphragm Pumps
        • 24. Reciprocating Slurry Pumps
        • 25. Vortex Pumps
        • 26. Pump Sealing Requirements
        • 27. Stuffing Boxes
        • 28. Packing Materials
        • 29. Installing Packing
        • 30. Mechanical Seals
        • 31. Special Seals
        • 32. Pump and Sleeve Bearings
        • 33. Antifriction and Special Bearings
        • 34. Bearing Lubrication
        • 35. Bearing Seals
        • 36. Pump Installation and Maintenance
        • 37. End-Suction Centrifugal Pumps
        • 38. Vertical Turbine Pumps
        • 39. Rotary Pumps
        • 40. Reciprocating Pumps
        • 41. Difficult Material Pumps and Other Maintenance Problems
  • Electrical Safety (NFPA 70E 2024)
    • Electrical Safety (NFPA 70E 2024) Part 1 [25 Activities]
      • 01. Article 90: Sections 90.1, 90.2, 90.3
      • 02. Article 90: Sections 90.4, 90.5, 90.6
      • 03. Article 100 Definitions
      • 04. Article 105, Application of Safety-Related Work Practices and Procedures
      • 05. Article 110, General Requirements for Electrical Safety-Related Work Practices
      • 06. Section 110.3, Electrical Safety Program.
      • 07. Section 110.4, Training Requirements.
      • 08. Section 110.5 Host and Contract Employers’ Responsibilities.
      • View Additional Activities
        • 09. Section 110.6, Test Instruments and Equipment.
        • 10. Section 110.7(A)&(B), Portable Cord- and-Plug-Connected Electric Equipment.
        • 11. Section 110.7(C)-(F), Portable Cord- and-Plug-Connected Electric Equipment.
        • 12. Section 110.8, Ground-Fault Circuit-Interrupter (GFCI) Protection.
        • 13. Sections 110.8, Ground-Fault Circuit-Interrupter (GFCI) Protection. 110.9 Overcurrent Protection Modification. 110.10 Equipment Use.
        • 14. Article 120, Establishing an Electrically Safe Work Condition
        • 15. Section 120.2, Lockout/Tagout Program.
        • 16. Section 120.3, Lockout/Tagout Principles.
        • 17. Section 120.4, Lockout/Tagout Equipment.
        • 18. Section 120.5?Lockout/Tagout Procedures PART-I.
        • 19. Section 120.5 Lockout/Tagout Procedures PART-II.
        • 20. Section 120.6, Process for Establishing and Verifying an Electrically Safe Work Condition.
        • 21. Article 130: Work Involving Electrical Hazards
        • 22. Section 130.5, Arc Flash Risk Assessment.
        • 23. Section 130.7(C)(1) through (C)(8), Personal and Other Protective Equipment.
        • 24. Section 130.7(C)(9) through (C)(15), Personal and Other Protective Equipment.
        • 25. Section 130.7(C). Personal Protective Equipment (Tables).
    • Electrical Safety (NFPA 70E 2024) Part 2 [15 Activities]
      • 01. Section 130.7(D). Other Protective Equipment.
      • 02. Section 130.8(A)-(D). Other Precautions for Personnel Activities.
      • 03. Section 130.8(E)–(N). Other Precautions for Personnel Activities.
      • 04. Section 130.8(O). Alerting Techniques.
      • 05. Section 130.9, Work Within the Limited Approach Boundary or Arc Flash Boundary of Overhead Lines
      • 06. CHAPTER 2, SAFETY-RELATED MAINTENANCE REQUIREMENTS.
      • 07. Article 205, General (Requirements)
      • 08. Article 210, Substations, Switchgear Assemblies, Switchboards, Panelboards, Motor Control Centers, and Disconnect Switches
      • View Additional Activities
        • 09. Article 215, Premises Wiring
        • 10. Article 220, Controller Equipment
        • 11. Article 225, Fuses and Circuit Breakers
        • 12. Article 230, Rotating Equipment
        • 13. Article 235, Hazardous (Classified) Locations
        • 14. Article 240: Batteries and Battery Rooms
        • 15. Article 245, Portable Electric Tools and Equipment
  • Module One. Successful Water Utilities Management: Theories and Planning
    • Introduction to Water Utility Management [1 Activities]
      • 01. Module One. Successful Water Utilities Management: Theories and Planning
    • Quiz #1 (3 questions)
    • Characteristics of Successful Water Utility Management [1 Activities]
      • 01. Characteristics of Successful Water Utility Management
    • Quiz #2 (3 questions)
    • Management Theories [1 Activities]
      • 01. Management Theories
    • Quiz #3 (3 questions)
    • Problems Associated with Management: Overview [1 Activities]
      • 01. Problems Associated with Management, Overview
    • Quiz #4 (1 questions)
    • Problems Associated with Management: Planning [1 Activities]
      • 01. Planning
    • Quiz #5 (2 questions)
    • Problems Associated with Management: Risk Assessment [1 Activities]
      • 01. Risk Assessment
    • Quiz #6 (2 questions)
    • Risk Management [1 Activities]
      • 01. Risk Management
    • Quiz #7 (4 questions)
    • Best Practices for Water Utility Management: Overview [1 Activities]
      • 01. Best Practices, Overview
    • Quiz #8 (1 questions)
    • Best Practices for Water Utility Management: Self-Assessment [1 Activities]
      • 01. Best Practices for Water Utility Management: Self-Assessment
    • Quiz #9 (2 questions)
    • Best Practices for Water Utility Management: Organizational Culture [1 Activities]
      • 01. Best Practices for Water Utility Management: Organizational Culture
    • Quiz #10 (1 questions)
  • Module Two. Practical Approaches to Utility Management
    • Overview (Practical Approaches to Utility Management) [1 Activities]
      • 01. Module Two. Practical Approaches to Utility Management
    • Quiz #11 (1 questions)
    • Lean Techniques [1 Activities]
      • 01. Lean Techniques
    • Quiz #12 (2 questions)
    • Additional Resources and Tools: Overview [1 Activities]
      • 01. Additional Resources, Overview
    • Quiz #13 (1 questions)
    • Additional Resources and Tools: Effective Utilities Management (EUM) [1 Activities]
      • 01. Additional Resources and Tools: Effective Utilities Management (EUM)
    • Quiz #14 (2 questions)
    • Additional Resources and Tools: Case Studies [1 Activities]
      • 01. Additional Resources and Tools: Case Studies
    • Quiz #15 (2 questions)
    • Continual Improvement Management [1 Activities]
      • 01. Continual Improvement Management
    • Quiz #16 (2 questions)
    • Reliability [1 Activities]
      • 01. Reliability
    • Quiz #17 (2 questions)
  • Module Three. Workplace Safety: Requirements and Resources
    • Overview of Workplace Safety [1 Activities]
      • 01. Module Three. Workplace Safety
    • Quiz #18 (2 questions)
    • Hazardous Materials and Environmental Risks [1 Activities]
      • 01. Hazardous Materials and Environmental Risks
    • Quiz #19 (2 questions)
    • Workplace Hazards [1 Activities]
      • 01. Workplace Hazards
    • Quiz #20 (2 questions)
    • Safety Recommendations [1 Activities]
      • 01. Safety Recommendations
    • Quiz #21 (3 questions)
    • Safety Requirements [1 Activities]
      • 01. Safety Requirements
    • Quiz #22 (3 questions)
    • Safety Resources [1 Activities]
      • 01. Safety Resources
    • Quiz #23 (2 questions)
    • Conclusion [1 Activities]
      • 01. Conclusion
    • Quiz #24 (2 questions)
  • Course Completion
    • Mandatory Questionnaire
    • California Fluid Mechanics - Certificate of Achievement (1 of 8)
    • California Valve Maintenance and Piping System Protection - Certificate of Achievement (2 of 8)
    • California Piping Systems: Part 1 - Certificate of Achievement (3 of 8)
    • CA Piping Systems: Part 2 - Certificate of Achievement (4 of 8)
    • California Pumps: Part 1 - Certificate of Achievement (5 of 8)
    • California Pumps: Part 2 - Certificate of Achievement (6 of 8)
    • California Electrical Safety (NFPA 70E 2024) - Certificate of Achievement (7 of 8)
    • California Water Utility Management - Certificate of Achievement (8 of 8)