Save with our 30 Hour Package for Wastewater Operators. This package includes the following courses:

  • Electrical Safety (NFPA 70E 2024) - 6 hours
  • Fluid Mechanics - 1 hour
  • Introduction to Water Technology - 5 hours
  • Maintaining Wastewater Equipment - 5 hours
  • Pump Installation and Maintenance - 4 hours
  • Storage Tanks - 2 hours
  • Wastewater Treatment Processes - 5 hours
  • Water Distribution Systems - 2 hours

Course Format: Text

Credit Type: General, Water

Approved By: Department of Environmental Quality (ADEQ) - Water Quality Division

30-Hour Package for Wastewater Operators

  • Electrical Safety (NFPA 70E 2024)
    • Electrical Safety (NFPA 70E 2024) Part 1 [25 Activities]
      • 01. Article 90: Sections 90.1, 90.2, 90.3
      • 02. Article 90: Sections 90.4, 90.5, 90.6
      • 03. Article 100: Definitions
      • 04. Article 105: Application of Safety-Related Work Practices and Procedures
      • 05. Article 110: General Requirements for Electrical Safety-Related Work Practices
      • 06. Section 110.3, Electrical Safety Program.
      • 07. Section 110.4, Training Requirements.
      • 08. Section 110.5, Host and Contract Employers' Responsibilities.
      • 09. Section 110.6, Test Instruments and Equipment.
      • 10. Section 110.7(A)&(B), Portable Cord- and-Plug-Connected Electric Equipment.
      • 11. Section 110.7(C)-(F), Portable Cord- and-Plug-Connected Electric Equipment.
      • 12. Section 110.8, Ground-Fault Circuit-Interrupter (GFCI) Protection.
      • 13. Section 110.8, Ground-Fault Circuit-Interrupter (GFCI) Protection. 110.9, Overcurrent Protection Modification. 110.10, Equipment Use.
      • 14. Article 120: Establishing an Electrically Safe Work Condition
      • 15. Section 120.2, Lockout/Tagout Program.
      • 16. Section 120.3, Lockout/Tagout Principles.
      • 17. Section 120.4, Lockout/Tagout Equipment.
      • 18. Section 120.5, Lockout/Tagout Procedures PART-I.
      • 19. Section 120.5, Lockout/Tagout Procedures PART-II.
      • 20. Section 120.6, Process for Establishing and Verifying an Electrically Safe Work Condition.
      • 21. Article 130: Work Involving Electrical Hazards
      • 22. Section 130.5, Arc Flash Risk Assessment.
      • 23. Section 130.7(C)(1) through (C)(8), Personal and Other Protective Equipment.
      • 24. Section 130.7(C)(9) through (C)(15), Personal and Other Protective Equipment.
      • 25. Section 130.7(C), Personal Protective Equipment (Tables).
    • Electrical Safety (NFPA 70E 2024) Part 2 [15 Activities]
      • 01. Section 130.7(D), Other Protective Equipment.
      • 02. Section 130.8(A)-(D), Other Precautions for Personnel Activities.
      • 03. Section 130.8(E)-(N), Other Precautions for Personnel Activities.
      • 04. Section 130.8(O), Alerting Techniques.
      • 05. Section 130.9, Work Within the Limited Approach Boundary or Arc Flash Boundary of Overhead Lines
      • 06. CHAPTER 2: SAFETY-RELATED MAINTENANCE REQUIREMENTS.
      • 07. Article 205: General (Requirements)
      • 08. Article 210: Substations, Switchgear Assemblies, Switchboards, Panelboards, Motor Control Centers, and Disconnect Switches
      • 09. Article 215: Premises Wiring
      • 10. Article 220: Controller Equipment
      • 11. Article 225: Fuses and Circuit Breakers
      • 12. Article 230: Rotating Equipment
      • 13. Article 235: Hazardous (Classified) Locations
      • 14. Article 240: Batteries and Battery Rooms
      • 15. Article 245: Portable Electric Tools and Equipment
  • Fluid Mechanics [11 Activities]
    • 01. Definition of a Fluid
    • 02. Fluids Distribute Forces
    • 03. Definition of Pressure
    • 04. Measuring Pressure
    • 05. Sources of Fluid Pressure
    • 06. Gauge Verses Absolute Pressure
    • 07. Liquid Seeks Its Own Level
    • 08. Velocity Head Verses Static Pressure
    • 09. The Bernoulli Effect and Venturi Applications
    • 10. Friction Head
    • 11. The Siphon
  • Introduction to Water Technology [51 Activities]
    • 01. The Water Cycle
    • 02. Precipitation
    • 03. Surface Runoff
    • 04. Groundwater
    • 05. Lots of Water, but…
    • 06. Water Use
    • 07. Industrial Use
    • 08. Agricultural Use and Waste
    • 09. Beginning of Waterworks
    • 10. Centuries of Neglect
    • 11. Water Treatment - Beginning to Today
    • 12. Collecting Surface and Ground Water
    • 13. Transmission of Water
    • 14. Why Treat the Supply Water?
    • 15. Types of Treatment
    • 16. Treatment in the Treatment Plant and Distribution
    • 17. Collecting Wastewater
    • 18. Treating Wastewater
    • 19. Primary Treatment
    • 20. Secondary Treatment
    • 21. Tertiary Treatment
    • 22. Basic Properties of Water
    • 23. The Color of Water
    • 24. Measuring Water Color
    • 25. Taste and Odor of Water
    • 26. The Temperature of Water
    • 27. Solids in Water
    • 28. Total Solids in Water
    • 29. Volatile and Fixed Solids
    • 30. Turbidity and Suspended Matter
    • 31. Electrical Conductivity
    • 32. Atoms and Molecules
    • 33. Acids, Bases, and Salts
    • 34. The Ionization of Water
    • 35. Alkalinity
    • 36. Acidity
    • 37. Hardness of Water
    • 38. Other Unwanted Chemicals
    • 39. Dissolved Oxygen
    • 40. Pathogenicity
    • 41. Disinfection
    • 42. Stabilization of Organic Matter
    • 43. Biochemical Oxygen Demand
    • 44. Factors Affecting Growth
    • 45. The Food Chain and Living Things
    • 46. Bacteria
    • 47. Environmental Classifications of Bacteria
    • 48. Bacteria in Treatment Plants
    • 49. Viruses
    • 50. Algae
    • 51. Protozoa and Higher Organisms
  • Maintaining Wastewater Equipment [41 Activities]
    • 01. Collection Systems
    • 02. Pumping Stations
    • 03. Pump Operations
    • 04. Pump Types
    • 05. Pump Maintenance
    • 06. Pump Drive Units
    • 07. Piping, Ventilation, and Control Systems
    • 08. Level Detection
    • 09. Station Operation and Maintenance
    • 10. Safety Considerations
    • 11. Hand-Cleaned Bar Screens
    • 12. Mechanically Cleaned Bar Screens
    • 13. Grinders
    • 14. Rotating Drum Comminutors
    • 15. Stationary Screen Comminutors
    • 16. Barminutors
    • 17. The Nature of Grit
    • 18. Hand-Cleaned Grit Chambers
    • 19. Maintaining Hand-Cleaned Grit Chambers
    • 20. Detritus Tanks
    • 21. Maintaining Detritus Tanks
    • 22. Chain and Flight Grit Collectors
    • 23. Maintaining Chain and Flight Grit Collectors
    • 24. Aerated Grit Chambers and Cyclone Separators
    • 25. Maintaining Aerated Grit Chambers
    • 26. Sedimentation
    • 27. Rectangular Clarifiers
    • 28. Scum Removal
    • 29. Circular Clarifiers
    • 30. Sludge Removal
    • 31. Laboratory Testing
    • 32. Troubleshooting
    • 33. Safety Considerations
    • 34. Properties of Flowing Liquids
    • 35. Flow Measurement Methods, Including Batch Processes
    • 36. Flow Measurement in Open Channels
    • 37. Measuring Flow from Freely Discharging Pipes
    • 38. Methods of Depth Measurement
    • 39. Flow Measurement in Completely Filled Pipes
    • 40. Methods of Pressure Measurement
    • 41. Maintenance of Flow Measurement Devices
  • Pump Installation and Maintenance [52 Activities]
    • 01. Force and Work
    • 02. Power and Horsepower
    • 03. Energy
    • 04. Velocity and Acceleration
    • 05. Static Suction Lift
    • 06. Pressure Losses: Friction and Vapor Pressure
    • 07. Available and Required Net Positive Suction Head (NPSH)
    • 08. Checking Pump Capacity and Pumping Hot Water
    • 09. Computing Pump Power Requirements and Effects of Operational Factors
    • 10. Priming a Pump
    • 11. Uses and Types of Packing and Seals
    • 12. Packing
    • 13. Selecting Packing Material
    • 14. Removing Old Packing
    • 15. Installing New Packing
    • 16. Testing New Packing and Packing Precautions
    • 17. Mechanical Seals
    • 18. Mechanical Seals Versus Packing
    • 19. Types of Mechanical Seals
    • 20. Installing Mechanical Seals
    • 21. Maintaining and Troubleshooting Packing and Seals
    • 22. Installing the Pump and Preparing the Foundation
    • 23. Fabricated Steel Baseplates
    • 24. Checking Shaft Alignment and Grouting the Baseplate
    • 25. Mounting Pump and Motor Separately
    • 26. Compensating for Heat and Installing Auxiliary Pump Drives
    • 27. Maintaining Centrifugal Pumps
    • 28. Inspecting Packing, Seals, and Bearings
    • 29. Motor and Drive
    • 30. Avoiding Common Pump Problems
    • 31. Cavitation
    • 32. Ring Seizure
    • 33. Overheating
    • 34. Pump Operation
    • 35. Scheduling Maintenance and Troubleshooting
    • 36. Preparation, Work Areas, and Rigging
    • 37. Moving a Pump
    • 38. Disassembling a Pump
    • 39. Inspecting Pump Parts
    • 40. Checking Clearances
    • 41. Reassembling a Pump
    • 42. Reinstalling a Pump
    • 43. Types of Rotary Pumps
    • 44. Gear-Type and Vane-Type Rotary Pumps
    • 45. Axial-Flow Pumps
    • 46. Installing Rotary Pumps
    • 47. Aligning Pump and Piping
    • 48. Direction of Rotation
    • 49. Pump Start-Up
    • 50. Maintaining Rotary Pumps
    • 51. Scheduling Inspections and Maintenance
    • 52. Troubleshooting Rotary Pumps
  • Storage Tanks [14 Activities]
    • 01. An Introduction to Storage Tanks and Their Facilities
    • 02. Common Types and Classification
    • 03. Sizes and Common Materials
    • 04. Storage Tank Components
    • 05. Basic Operation
    • 06. Water Demand
    • 07. Regulations and Standards
    • 08. Regulations and Standards: Facility and Tank Construction
    • 09. General Maintenance
    • 10. Disinfection and Sanitation
    • 11. Safety
    • 12. Security
    • 13. Inspections
    • 14. Conclusion
  • Wastewater Treatment Processes [46 Activities]
    • 01. Purpose of Treatment
    • 02. Sources of Wastewater
    • 03. Wastewater Collection Systems
    • 04. Typical Treatment Facilities
    • 05. Influent
    • 06. Preliminary Treatment
    • 07. Primary Treatment
    • 08. Secondary Treatment
    • 09. Tertiary Treatment
    • 10. Disinfection and Effluent Discharge
    • 11. Solids Handling
    • 12. Screening
    • 13. Grinding
    • 14. Grit Removal
    • 15. Sedimentation
    • 16. Factors Affecting Settling Rates
    • 17. Types of Clarifiers
    • 18. Air Flotation
    • 19. Filtration and Effluent Disposal
    • 20. Solids in Wastewater
    • 21. Chemical Coagulants
    • 22. Phosphorus Removal
    • 23. Chemical Clarification Equipment
    • 24. Disinfection
    • 25. Factors Affecting Disinfection
    • 26. Disinfection with Chlorine
    • 27. Equipment Used in Chlorine Feeding
    • 28. Lagoons
    • 29. Activated Sludge
    • 30. Aeration with Pure Oxygen
    • 31. Trickling Filters
    • 32. Distribution Systems
    • 33. Trickling Filter Operations
    • 34. Synthetic Media
    • 35. Activated Biofilter Processes (ABF)
    • 36. Rotating Biological Contactors (RBC)
    • 37. Secondary Clarifiers
    • 38. Three Processes
    • 39. Sludge Conditioning
    • 40. Thickening and Dewatering
    • 41. Drying Beds
    • 42. Lagoons
    • 43. Vacuum Filtration and Filter Presses
    • 44. Further Reduction of Water Content
    • 45. Composting
    • 46. Ultimate Disposal
  • Water Distribution Systems [12 Activities]
    • 01. Introduction
    • 02. Topologies
    • 03. Pipeline Operation
    • 04. Meters, Valves, and Hydrants
    • 05. Pumps and Motors
    • 06. Storage Tanks & Facilities
    • 07. Fire Protection
    • 08. SCADA Systems
    • 09. EPA Regulations and Groundwater Rule
    • 10. Maintenance
    • 11. Potential System Problems
    • 12. Distribution System Water Quality Issues

Course Completion

  • Mandatory Questionnaire
  • Electrical Safety (NFPA 70E 2024) - Certificate of Achievement
  • Fluid Mechanics - Certificate of Achievement
  • Introduction to Water Technology - Certificate of Achievement
  • Maintaining Wastewater Equipment - Certificate of Achievement
  • Pump Installation and Maintenance - Certificate of Achievement
  • Storage Tanks - Certificate of Achievement
  • Wastewater Treatment Processes - Certificate of Achievement
  • Water Distribution Systems - Certificate of Achievement