This 24-hour package is approved for Alabama ADEM water operators and is intended for licensees with a single water certificate:

The following courses are included:

  • Pumps: Part 1
  • Pumps: Part 2
  • Piping Systems: Part 1
  • Piping Systems: Part 2
  • Valve Maintenance and Piping System Protection

This package is approved for ADEM WATER OPERATORS only.

Approved By: Department of Environmental Management

  • 24-Hour Package for ADEM Water Operators
    • Pumps: Part 1 [42 Activities]
      • 01. The Development of Pumps
      • 02. Pumping Systems
      • 03. Water Pumping Systems
      • 04. Chemical Pumping Systems
      • 05. Waste Pumping Systems
      • 06. High-Viscosity Material Pumping Systems
      • 07. Solid Pumping Systems
      • 08. Pumping Terminology
      • View Additional Activities
        • 09. Calculating Total Head
        • 10. Horsepower Calculations
        • 11. Total Energy vs Available NPSH
        • 12. Available NPSH vs Required NPSH
        • 13. Pump Performance Curves
        • 14. Head Capacity Curves
        • 15. Curve Families
        • 16. Pump Selection
        • 17. Centrifugal Pumps
        • 18. Pump Part Definitions
        • 19. End-Suction Casing Configurations
        • 20. Split-Case Centrifugal Pumps
        • 21. Double-Volume Pumps
        • 22. Impeller Types
        • 23. Wear Rings
        • 24. Shafts, Bearings, and Sleeves
        • 25. Turbine Pumps Overview and Lineshaft Turbines
        • 26. Can Turbines
        • 27. Submersible Turbines
        • 28. Flow Patterns
        • 29. Axial-Flow Propeller Pumps
        • 30. Mixed-Flow Propeller Pumps
        • 31. Special Propeller Pumps and Turbine Pump Construction
        • 32. Vertical Turbine Pump Application
        • 33. Regenerative Turbine Pumps
        • 34. Introduction to Rotary Pumps
        • 35. External-Gear Pumps
        • 36. Internal-Gear Pumps
        • 37. Lobe Pumps
        • 38. Screw Pumps
        • 39. Vane Pumps
        • 40. Rotary Piston Pumps
        • 41. Flexible-Members Pumps
        • 42. Rotary Pump Installations
    • Pumps: Part 2 [41 Activities]
      • 01. Reciprocating Pump Applications
      • 02. Reciprocating Pump Parts
      • 03. Reciprocating Pump Classifications
      • 04. Steam-Driven Pump Operation
      • 05. Power Pump Operations
      • 06. Horizontal Plunger Pumps
      • 07. Vertical Plunger Pumps
      • 08. Air-Driven Pump Operations
      • View Additional Activities
        • 09. Introduction to Metering Pumps
        • 10. Metering Pump Classification
        • 11. Plunger and Piston Metering Pumps
        • 12. Diaphragm Pumps
        • 13. Air-Operated Metering Pumps
        • 14. Rotary Metering Pumps
        • 15. Handling Difficult Materials
        • 16. Chemical Pumps
        • 17. Special Chemical Pumps
        • 18. Magnetic-Drive Pumps
        • 19. Canned-Motor Pumps
        • 20. Centrifugal Slurry Pumps
        • 21. Pulp-Handling Pumps
        • 22. Trash and Sewage Pumps
        • 23. Diaphragm Pumps
        • 24. Reciprocating Slurry Pumps
        • 25. Vortex Pumps
        • 26. Pump Sealing Requirements
        • 27. Stuffing Boxes
        • 28. Packing Materials
        • 29. Installing Packing
        • 30. Mechanical Seals
        • 31. Special Seals
        • 32. Pump and Sleeve Bearings
        • 33. Antifriction and Special Bearings
        • 34. Bearing Lubrication
        • 35. Bearing Seals
        • 36. Pump Installation and Maintenance
        • 37. End-Suction Centrifugal Pumps
        • 38. Vertical Turbine Pumps
        • 39. Rotary Pumps
        • 40. Reciprocating Pumps
        • 41. Difficult Material Pumps and Other Maintenance Problems
    • Piping Systems: Part 1 [45 Activities]
      • 01. Piping Systems
      • 02. Fluids
      • 03. Protecting Steam Lines
      • 04. Keeping Fluids Clean and Moving
      • 05. Piping System Maintenance
      • 06. Valves and Fittings
      • 07. Pipe Hangers and Supports
      • 08. Temperature Effects
      • View Additional Activities
        • 09. Piping Insulation
        • 10. Typical Piping Systems
        • 11. Maintenance Considerations
        • 12. Pipes
        • 13. Pipe Schedules and Other Pipe Codes
        • 14. Types of Systems
        • 15. Metal Piping and Characteristics of Metals
        • 16. Pipe-Manufacturing Methods
        • 17. Behavior of Fluids in Piping
        • 18. Piping Applications
        • 19. Maintenance Considerations
        • 20. Joining Pipe
        • 21. Nonmetallic Piping Materials
        • 22. Concrete Pipe
        • 23. Asbestos-Cement Pipe
        • 24. Plastic Pipe
        • 25. Limitations of Plastic Pipe
        • 26. Joining Plastic Pipe
        • 27. Maintaining Plastic Pipe
        • 28. Glass Pipe
        • 29. Maintenance Requirements
        • 30. Tubing
        • 31. Advantages of Tubing
        • 32. Tube Joining
        • 33. Types of Tubing
        • 34. Tubing Applications
        • 35. Plastic Tubing
        • 36. Other Applications and Maintenance
        • 37. Hoses
        • 38. Codes and Sizes
        • 39. Hose Classifications
        • 40. Hose Terminology
        • 41. Reinforced Nonmetallic Hose
        • 42. Nonmetallic Hose
        • 43. Metallic Hose
        • 44. Hose Couplings
        • 45. Maintenance
    • Piping Systems: Part 2 [49 Activities]
      • 01. Fittings
      • 02. Functions of Fittings
      • 03. Screwed and Flanged Connections
      • 04. Other Fittings
      • 05. Welded Connections
      • 06. Tube Fittings
      • 07. Drawing Symbols
      • 08. Valves
      • View Additional Activities
        • 09. Types of Industrial Valves
        • 10. Gate Valves
        • 11. Globe Valves
        • 12. Needle Valves
        • 13. Ball Valves
        • 14. Butterfly Valves
        • 15. Plug Valves
        • 16. Check Valves
        • 17. Quick-Opening Valves
        • 18. Valve Maintenance and Connections
        • 19. Specialized Valves and Diaphragm Valves
        • 20. Blowdown Valves
        • 21. Pressure-Regulating Valves
        • 22. Temperature-Regulating Valves
        • 23. Safety Valves
        • 24. Relief Valves
        • 25. Rupture-Disk Relief Valves
        • 26. Reducing Valves
        • 27. Other Valves
        • 28. Valve Operators
        • 29. Magnetic, Pneumatic, and Hydraulic Operators
        • 30. Remote Control
        • 31. General Applications
        • 32. Strainers
        • 33. Filters
        • 34. Steam
        • 35. Traps
        • 36. Vent Valves
        • 37. Trap Maintenance
        • 38. Typical Piping System
        • 39. Pressure Gauges
        • 40. Temperature Gauges
        • 41. Rotary Pressure Joints
        • 42. Vacuum Breakers
        • 43. Accumulators
        • 44. Receivers
        • 45. Actuators and Intensifiers
        • 46. Pneumatic Pressure Line Accessories
        • 47. Heat Exchangers
        • 48. Wrenches
        • 49. Maintenance
    • Valve Maintenance and Piping System Protection [53 Activities]
      • 01. Valve Materials
      • 02. Threaded Connections
      • 03. Welded and Brazed Connections
      • 04. Flanged Connections
      • 05. Valve Installation
      • 06. Repairing Gate Valves
      • 07. Repairing Globe and Angle Valves
      • 08. Repairing Ball Valves
      • View Additional Activities
        • 09. Maintaining Plug Valves
        • 10. Maintaining Check Valves
        • 11. General Maintenance
        • 12. Special Valves
        • 13. Butterfly Valves
        • 14. Diaphragm Valves
        • 15. Pop Safety Valves
        • 16. Relief Valves
        • 17. Safety Relief Valves
        • 18. Pressure-Reducing and Regulating Valves
        • 19. Quick-Opening Valves
        • 20. Valve Actuators
        • 21. Diaphragm Actuators
        • 22. Piston Actuators
        • 23. Electric Actuators
        • 24. Actuator Installation
        • 25. Actuator Maintenance and Repair
        • 26. Bourdon Tube
        • 27. Bimetallic Gauge
        • 28. Bellows Gauge
        • 29. Flowmeters
        • 30. Rotating Unions
        • 31. Accumulators
        • 32. Air Receivers
        • 33. Application Considerations and Studying the Total System
        • 34. Valve Applications
        • 35. Valve Materials
        • 36. Valve Identification
        • 37. Soldered Valve Connections
        • 38. Threaded Valve Connections
        • 39. Flanged Valve Connections
        • 40. Tool Selection
        • 41. Valve Location
        • 42. Positioning the Valve
        • 43. Protecting Hot Pipelines
        • 44. Heat Conduction, Convection, and Radiation
        • 45. Installing and Maintaining Insulation
        • 46. Tracing
        • 47. Installing Steam Tracers
        • 48. Electric Tracing, Tracing Valves, and Fittings
        • 49. Protection From Freezing
        • 50. Protection From Corrosives
        • 51. Active and Passive Protection
        • 52. Inspection of Piping Protection
        • 53. Hangers and Supports
  • Course Completion
    • Mandatory Questionnaire
    • Pumps: Part 1 - Certificate of Achievement (1 of 5)
    • Pumps: Part 2 - Certificate of Achievement (2 of 5)
    • Piping Systems: Part 1 - Certificate of Achievement (3 of 5)
    • Piping Systems: Part 2 - Certificate of Achievement (4 of 5)
    • Valve Maintenance and Piping System Protection - Certificate of Achievement (5 of 5)
Instructor Image

Instructor Bio

All At Your Pace Online courses are written, reviewed, and developed by internal and external subject matter experts (SMEs) with decades of experience in the water operator industry and related trades.